My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/20/2007 PLANNING BOARD Minutes
>
06/20/2007 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 5:08:55 PM
Creation date
1/25/2022 9:01:06 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
06/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms . A sl.er concluded her presentation at this point, <br /> 8 : 40 p.m. <br /> The Chairman provided copies of an article. printed- ire <br /> the Cape Cod Tines, June 14 , 2007, "Lawsuit stalls Horne <br /> Windmill" . <br /> Review <br /> Town of Mashpee Zoning By-Law For Land-Ba°sed Wind <br /> Energy Conversion Facilities <br /> Reprised by Planning Board06/15/07 <br /> Point of Information: Selectman Don Myers was present <br /> for this portion of the Meeting. <br /> Purpose and Intent - ""It is the express purpose of <br /> this by-law to aceommod'ate distributed wind energy <br /> conversion facilities WECFs) in, appropriate land based <br /> locations, while pr6tecting public health, safety, welfare, <br /> and character of neighborhoods, property values, <br /> preservation of environmental, historical and scenic <br /> resources while minimizing adverse impacts of WECFs . The <br /> by-law enables the review of wind energy conversion <br /> facilities by the Town' s special Permit Granting Authority, <br /> clarifying the criteria for siting such a facility. All <br /> WECFs require a special permit. This by-law is intended t.o <br /> be used in conjunction with other r-egulations adopted b <br /> the Town, including., but not limited to, historic district <br /> regulations, plan review and other applicable by-laws and <br /> regulations to encourage appropriate land use and <br /> environmental protection. Further, it is the express <br /> intent of this by-law that a-ny special permit hereunder <br /> granted runs with the land and that any subsequent owner of <br /> said land be bound by the terms and conditions of said <br /> spec-ial permit . " <br /> Definitions - Clear Area, include a reference to the <br /> appropriate section. <br /> Land-based - Include setbacks of 20-ft. and 0-ft. <br /> It was agreed that the word „proponent,, be changed t <br /> read "applicant" throughout the document. <br /> Use Regulations ulatioans - "Wind Energy Conversion Facility and <br /> Wind Monitoring or Meteorological Towers . All WEC Fs or <br /> Wind Monitoring or Meteorological Towers shall require a <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.