Laserfiche WebLink
between $10, 000 . 0 and $12, 0 . ; remove, order, and <br /> relocate missing plants (including lab-or) between <br /> $22, 8.00 . 00 and 2 , 00. 00; order missing trees (including <br /> labor to Plant) between $1 , 0- . 0 0 and $20, 500. 00 . The <br /> total figure, according to his calculations, is between <br /> $ I, , . o and 7, . <br /> r. Curran volunteered to act as Planning Board <br /> representative, as a horticulturist, to rake certain that <br /> the work is done correctly. He would put the job out to <br /> bid and would consider the top three from qualified <br /> landscapers/contractors. Again, he volunteered to <br /> supervise the landscaping. <br /> The Nice-Chairman then recognized Torn Quinn who spoke <br /> to the issue of road surfaces . He stated that all of the <br /> roads have been top coated. some of the residents in Phase <br /> I have indicated that they ou:ld Like to have everything <br /> resurfaced. <br /> It is Ir. Quinn' s position that the Town-I Consulting <br /> Engineer, Charles Fowler, made a final inspection in this <br /> regard, and h.e approved and signed off on it . <br /> The Vice-Chairman recognized Jean Brown, who stated <br /> the entrance to Windchi e/Bob White ha-s never been <br /> completed (paved) . <br /> When questioned, -Mr. Rowley stated that this ratter <br /> would have been addressed so long ago that he would have to <br /> check his records and report back to the Planning Board. <br /> The Vice Chairman recognized Lary Scanlon who stated <br /> it is her understanding that Bob G hit,e Crescent and the <br /> entrance way have never had a finished coat . When this <br /> matter wa-s brought to Mr. Bornstein' s attention, he had <br /> agreed to finish Bob White Crescent. . The only work that <br /> has been done is a. patch in front of Unit 10 . <br /> The Town Planner noted that this night have been a <br /> private agreement between the developer and the residents . <br /> e stated that he was not prepared to address this issue at <br /> this time and that he did not have any .paving information <br /> or the file with him. He did agree to loop into the re- <br /> surfacing issues. <br /> 4 <br />