My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/24/2006 PLANNING BOARD Minutes
>
07/24/2006 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 10:52:48 AM
Creation date
1/25/2022 10:25:28 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
07/24/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Vice Chairman then recognized Tory Quinn who stated <br /> that he feels the planting/landscaping looks good, he feels <br /> the landscaping in this phase looks better than in the <br /> precious phases, and that there are double the number of <br /> plantings in this phase. <br /> r. Quinn informed the Board that Mr. Bornstein had <br /> agreed to pa-y Mr. Curran to prepare an "as ]wilt" plan, <br /> working with the existing trees and adding to what was <br /> already planted. He stated that 9 of the plan was "a <br /> built", and that there was never any intent to draw an <br /> entirely new plan. <br /> The suggestion to draw a new plan was Mr. Curran' <br /> notion. 'There was a cap -of 25 -pieces placed on the number <br /> of plantings to be brought in, and there was nearer an <br /> agreement with respect to gallonage. <br /> Mr. Quinn reiterated there was nearer a new plan, that <br /> notes had been made onto the existing plan. The main issue <br /> of disagreement was the level of compensation Mr. Curran <br /> wanted to be paid. <br /> r. Bornstein nearer agreed to pay Mir. Curran, a <br /> compensation schedule was nearer agreed to or prepared. <br /> Compensation was the only issue of contention. <br /> r. Quinn stated that Mr. Bornstein adjusted the size <br /> of the plantings to match the other plantings in previous <br /> phases throughout the project. The proper number of plants <br /> were purchased, some substitutions were made. <br /> Mr. Quinn agreed to fix, replace, and relocate some of <br /> the existing plantings. He stated there was no punch list <br /> to refer to, twelve (12) .cherry trees have been .planted. <br /> With reference to the issue raised by Mr. Curran <br /> regarding Ms. JudyQuinn' s property/letter, Mr. Quinn <br /> stated it is indicated on the plan to "'provide some <br /> screening"'...it was never agreed to block out the view of the <br /> wastewater treatment plant . He noted that the Mashpee <br /> Commons wastewater treatment plant is also in this property <br /> owner' s view. <br /> Mr. Quinn made it clear that the property owner with <br /> reference to this matter is no relation. ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.