Laserfiche WebLink
Ok <br /> Partnership-storage/Incubator Buildings 100 Falmouth Road <br /> ( .out:e 2 ) " . <br /> Findings <br /> Reference was made to the new text on page -3- <br /> Paragraph 6 „The size of the septic system has increa-sed to <br /> 840 gallons per day..., <br /> Th-e Chairman inquired s to the Cape Cod Commission <br /> requirements/process after the Mashpee Planning Board has <br /> rendered a decision. <br /> The Town Planner stated he would provide a copy -of the <br /> Mashpee Special. Permit- to the Commission for their <br /> information. <br /> . - "Existing Title 5 wastewater flow from the <br /> current uses in the former Augat building is 5270 gallons <br /> per day, based o -0 gpd/10 0 o sq. f t. of retail space <br /> (51, 000 q. ft. ) and 20 gpd/locker (136 l c-kers) for Cold' s <br /> Gym . <br /> The Town Planner suggested. the Board of Health might <br /> require Applicant to upgrade the septic systems from the <br /> existing buildings to denitrifica:tion -systems . <br /> The Chairman expressed her concern for Applicant <br /> compliance with the number of Planning Board <br /> reports/requirement-s in the form of Conditions incorporated <br /> into the Special Permit. <br /> She suggested a checklist timeli-ne situation to better <br /> control Planning Board requirements as the project is being <br /> constructed. <br /> Myrna Duey suggested the establishment of a pro-ject <br /> tracking system for Planning Board use. <br /> The Assistant Town Planner informed the Board o-f a. <br /> program called 'Microsoft Project' designed to track <br /> projects . <br /> The Board agreed this type of tool would be extremely <br /> useful for not only this project, but for other Planning <br /> Board -approved projects as well . They encouraged further <br /> Investigation into this system. <br />