Laserfiche WebLink
The Town Planner advised that the Special Permit i <br /> enforced by the Building Inspector. He suggested a meeting <br /> w-it-h- the Building _ Inspector to make him aware of the <br /> Conditions of each Special Permit issued. <br /> The Town Planner al-so suggested, and t-he Board agreed, <br /> to schedule updates on a regular basis (quarterly) with the <br /> developer to be included as a condition of the Special <br /> Permit . <br /> 10 . - .,Due to substantial changes in the plans since <br /> their first meeting, the committee met again with the <br /> Applicant on Qctober 1 ,, 2006. The discussion focused <br /> primarily on storage of hazardous materials and on. the need <br /> for a working sot of drawings and fire code analysis <br /> Tegarding the warehouse and incubator portions of the <br /> buildings in order to property design a sprinkler and <br /> standpipe system. `• <br /> 11. - . ...comment letters dated March 15, July 10, <br /> September 29, October 4 and October 18, Zoo . " <br /> 12 . - " t the October 1 , 2006 Plan Review committee <br /> Meeting, Deputy Hamelin reduced the hydrant requirement to <br /> the two- adjacent to, the entrance gates, with the third <br /> hydrant optional . " <br /> Conditions <br /> 1 . - "...reprised on 1 .00, , '' This date may change <br /> according to Mr. l owley' s approval. <br /> 2 . "...October 18, 2006 letter to the Board by its <br /> Consulting Engineer..." <br /> . - "...14 0, q. ft. = , 0 1 . ..." relates to <br /> inspection fees made by the Consulting Engineer. There i <br /> a fee for any re-inspection at a cost of $100 . 00 per visit <br /> to be assessed to the developer. <br /> "It shall be a condition of this permit that it shall <br /> be developed in conformance with a-ll applicable local and <br /> state regulations . tr <br /> Ir. Bornstein asked about road construction. <br /> 4 <br />