Laserfiche WebLink
i <br /> MOTION: Dennis Balzarini made a Motion to approve the <br /> efinitive Plan sub '.et to <br /> the removal of all non-existent bounds <br /> prior to Board signature of revised Plan; which Motion was <br /> seconded by Steve Dolan and so voted unanimous) <br /> y. <br /> Approval Not Required <br /> Susan Lange - Cape & Islands Engineering - Endorsement of <br /> _ Plan <br /> The Chairman recognized John Slavins , Cape Island <br /> Engineering, .. � s <br /> g! eering, representing the Applicant,, who provided a Plan <br /> entitled, "Plan of Land located in Mashpee, MA preparedfor <br /> Anthony h1.1man and Dorothy Kagan, Dated September 3. 2002, <br /> Cape & Islands Engineering" ,, <br /> The Town Planner noted Lots 5 and 6 have frontage on <br /> Pickerel Cove Circle which is an approved subdivision <br /> street. He suggested the Board direct the ConsultingEngineer <br /> to make an inspection for re g ear <br /> or endation to the Board. The <br /> other alternative would be to submit a Definitive Plan <br /> to build the road at currentstandards. proposing <br /> Making reference to Section 81L, the <br /> Consulting Engineer <br /> earagreed to investigate and r port his findings to the Board for <br /> their decision. <br /> The Board advised Applicant of the possibility of rend <br /> Lots and s "L�r�buil er�ng <br /> dable Lots" should they choose to do so <br /> (until such time as the road is constructed . <br /> Mr. lavinsky filed said Plan the matter` was continued <br /> October for review of t � to <br /> e Consulting Engineer' s findings. <br /> Approval Not Required <br /> Norman Dias - Eastbound Lana Surveying - Quashnet road <br /> The Town Planner reported the Plan had been dropped <br /> a arten of t <br /> the Planning t, however there is no one present to <br /> actually submit the ANR. The Engineer has been informed that <br /> Staff is not authorized to submit this information at ' <br /> a Meeting. <br /> Staff noted there are some concerns with property lines/ <br /> perimeters of the � es <br /> i parcel. Also, there are discrepancies with the <br /> Deed description and the Assessors, <br /> Map. <br /> Release of Performance Guarantee <br /> New England Real Estate Group Trust - Kenneth Crosby <br /> The Chairman recognized Kenneth Crosby to bepresent. <br /> them made reference tthe <br /> o letter dated September 18, 2002, regarding <br /> Lot and Balfour Lane signed Charles <br /> y� Rowley, <br /> y� y� J <br /> i i � Char �s l�!� , i <br /> Engineering Consultant to Mashpee Planning Board. <br /> r. Rowley reported Applicant is requesting approval to <br /> page <br /> _1 - <br />