My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/18/2002 PLANNING BOARD Minutes
>
12/18/2002 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 5:13:44 PM
Creation date
1/26/2022 11:12:12 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
12/18/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
permission from the Board to authorize the Consulting <br /> Engineer to make an inspection of the property. <br /> References were being made to the plan regarding <br /> location and condition of the road. After brief discussion <br /> the Chairman entertained a motion. <br /> MOTION: Dennis Bal arin-i made a Motion to authorize <br /> the Consulting Engineer to mare an inspection of this <br /> property and report his findings. to the Board; which Motion <br /> wa-s seconded by Steve Dolan and so voted unanimously. <br /> Mike Crowe <br /> The Town Planner acknowledged that Mr. Crowe wa-s <br /> present at the Meeting, that he owns a lot on a paper <br /> street off Route 28 and now has to construct the road. <br /> There is no Covenant, the Subdivision is very old, and the <br /> Zoning By-law prohibits ..the issuance of a Building Permit <br /> unless the property is located on a street or the Planning <br /> Board, determines the road is adequate. <br /> References were being made to a Plan entitled, <br /> ..preliminary Site Plan, -5 Arabic Avenue in Mshpe , MA, <br /> dated December 16, 2002, prepared for Mr. Michael Crowe, <br /> prepared by EAS Survey, Inc. .. <br /> There was some discussion regarding current drainage <br /> requirements, grading details, and roadhouse location. <br /> The Consulting Engineer suggested detail of the <br /> existing site be obtained prior to presenting an evaluation <br /> based upon the site conditions . He then made reference to <br /> .Setion 7E of the- Regulations. He suggested the Applicant <br /> provide more grade detail, as well as soil data. <br /> MOTION: Dennis Bal arini made a Motion authorizing <br /> the Consulting Engineer to advise Applicant regarding <br /> drainage requirements in this -mat-ter; which Motion was <br /> seconded by Richard Term and so voted unanimously. <br /> Special Permit Modification <br /> Mashpee Commons - Buildings 3 and 4 Forth Market Street <br /> Dialysis Center <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.