My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/21/2001 PLANNING BOARD Minutes
>
03/21/2001 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 3:16:10 PM
Creation date
1/26/2022 11:22:38 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
03/21/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page <br /> reaction to the concept of laying the roods out as private streets/setbacks. There <br /> was a lengthy discussion about this. Mr. lirrane said he was looking for <br /> something adequate to create a layout. <br /> Torn Fudala mentioned conditions; one related to Connector Road. He said that <br /> this road would have to be built before other things begin. Don Megathlin <br /> admitted that this is an unresolved issue. There was mention of an agreement to <br /> phase this. Torn added that square footage of the shopping center was not <br /> specked and that he was confused about,the site plans. He said that the signal <br /> light could not be approved until Connector Fed. was built and that the <br /> Commission would set up the intersection. Don said that the Commission did <br /> approve the intersection, but not the signal, which has to be approved by the <br /> Highway Depart 17e1nt. Toni insisted that this all needs to be worked out, as it's <br /> not in the site plan. <br /> odon by Beverly to continue hearing to April 0 at 8 p.m. and that Torn would <br /> draft conditions based on the inforrnation that the Board now has. Seconded by <br /> Dennis, curried unanimously. <br /> New Seabury Development, Approval of 27 Lot Preliminar Plan (continued) <br /> Kenny lltta explained his plans to go forward with the cul de sac. He.asked if <br /> Charlie's recommendations could be crude part of the conditions for approval. <br /> Mo "on by Dennis to approve 27 lot preliminary plan subject to conformity of <br /> recommendations in Charlie's letter of March Ph. Seconded by Beverly, carried <br /> unanimously. <br /> Willowbend Development: Securltv Guarantee <br /> Attorney Robert Mills presented agreement for performance guarantee, secured <br /> by bank account. <br /> fo `on by Bevedy to release covenant based on receipt of funds for $2,126,250. <br /> Seconded by Dennis, canned unanimously. <br /> ,John Rodrinues e: Easement off Balfour Lane <br /> Mr. Rodrigues provided map of easement for plan of land. He recalled the'last <br /> meeting where he asked ed for 145 ft. of driveway to access lots. He showed where <br /> they would continue the driveway and where thy combined contiguous lots. He <br />
The URL can be used to link to this page
Your browser does not support the video tag.