Laserfiche WebLink
S <br /> Page 2 <br /> Charlie said he SO wanted to look at drainage calculations. Dennis had ar question <br /> about the roadway. Charlie mentioned some changes that were made on detail sheet. <br /> Torn Fudala had a question about the buffer requirement. He pointed to the plans and <br /> noted where it did not conform to zoning. He requested a copy of special permit. Charlie <br /> said he would like to see the changes noted and Dennis said he would like to see the <br /> approved site plain. <br /> Chris Costa produced the site plan to which Torn pointed out a partially impinged buffer. <br /> He said he would have to go back and appeal with the ZBA. There Was some <br /> discussion about modifying the street. Charlie said he talked io Chris about some pre- <br /> treatment. There was further discussion about this.and other alternatives. Charlie <br /> mentioned building a berm and doing some significant re-grading, however, he noted <br /> that they would be working with some difficult grades, no matter what they did. He said <br /> that without drainage structures, there is no containment in the event of-a chemical spill. <br /> Torn said that instead of catch basins that they build a trough to collect storm grater. <br /> charge said that, again,, you need proper grading to work with. It was determined that <br /> there i no simple solution. He did go into some detail about cutting ar swale in a flat <br /> spot. There was lengthy deliberation of plans. <br /> Chris Costa said that he thought this would be a good idea to granting a waiver. Dennis <br /> said that the Planning Board could either grant a waiver now or else they could try to <br /> cone up with other ideas for the buffer zone. Beverly said she would lice to see some <br /> more solutions before granting a waiver, to which Dennis concurred. Beverly suggested <br /> that Charlie w ite a letter of recommendation to the Planning Board regarding waivers. <br /> Motion by Beverly to continue the public hearing on this matter to December 19th at <br /> p.m. Seconded by Dick; unanimous. <br /> Applicant: Kenneth Anderson/Ferreira Associates; West side of Ashem Pate <br /> Request: Re.,signature of approved definitive subdivision plan for land court <br /> Torn Souza, representing Kenneth Anderson, said that when he went to Boston he was <br /> informed that that llylar plans have changed to clear point plans. Mr. Ferreira them seat <br /> along the correct plans, however, now the plans need to be signed again by the <br /> Planning Board. Since Martine was not present, and her signature was needed, the <br /> Board decided to take the plans and notify Mr. Souza when the required signatures <br /> were acquired. <br /> Items Presented by Torn Fudala not on Agenda <br /> D I approved for Anchor Self Storage. He requested a public hearing for January 2 nd at <br /> p.m. for special permit. <br />