Laserfiche WebLink
• Covenant Release <br /> g <br /> No <br /> charge if road system completed and satisfactory report filed of final <br /> E lit. <br /> construction inspection. <br /> request if release involves posting of other security for incomplete roads. <br /> ._ �75 per requ P g <br /> �,1�'i.s is• <br /> PeI'allt�odif catiOns <br /> .,, <br /> • " <br /> ilin fees for subdivision or special permit modifications shall be the same as <br /> listed above for an original application. <br /> ` w fees and inspection fees shall be the same as listed above for an original <br /> Review �p <br /> ` <br /> ' but based only on that portion of a project which is proposed to be <br />� application, Y P P <br /> modified,except that there will be no minimum fee. <br /> n fees shall be the same as listed above for an original application. <br /> }�11 Re4n,spectio <br /> "flan to the above fees, the applicant will be responsible for the cast of postage <br /> In adds <br /> mailing of aired notices to abutters. <br /> • form g re q <br /> .l`Rf <br /> Normal inspections covered by the basic inspection fees listed above include drainage <br /> Dormp <br /> inspection, gravel P vel inspection, inspection of paving binder course, inspection of paving <br /> r <br /> , t - course and final inspection far roadways in subdivisions and for roadways an <br /> sh . . <br /> } " areas in special permit projects other than cluster subdivisions, as well as other <br /> parking P <br /> ;1}Ail <br /> + evela meet exclusive of buildings, as required by the Planning Board, for spedal <br /> H; i,ii„ site development, <br /> p projects. <br /> ro ects. <br /> } <br /> Jli; <br /> _ins ection fee will be charged for additional inspections beyond those listed <br /> A re p <br /> ., above <br /> that are made necessary due to unsatisfactory materials or construction that lead to <br /> A <br /> a failure to pass the original inspection. <br /> „ . The filing and review fees specified above shall be submitted to the Board as part o <br /> the one pp <br /> original application for any permit. An application will be deemed to be incomplete <br /> f EEii <br /> without payment of said fees at the time of submittal. <br /> fees specified above shall be submitted to the board within 20 calendar <br /> 1.. Inspection P . . . . <br /> following the approval of any special permit and 1 or definitive subdivision plan and <br /> days g PP . . <br /> prior to the Board's endorsement of any subdivision plan or special permit decision. <br /> ' An ins ection fees due shall be submitted prior to the release of any roadway <br /> y re--inspection mi <br /> covenant or performance bond for road construction or other facilities covered by a <br /> cove <br /> " <br /> subdivision or special permmt approval. <br /> ,.0 <br /> Submitted by <br /> Patrick J. Coffey, Chairman <br /> Mash pee Planning Board <br /> � P <br /> lication: 116/95 and 1113/98 <br /> Pub . <br />