Laserfiche WebLink
_Fray. <br /> 7 required a connector read, thereby necessitating a land trade <br /> � <br /> w° between the Owner/Town in order to construct Great Hay Road as �� <br /> shown on the Plan, Dennis Balzarini recalled an abutter ilk <br /> =a' complaint was registered. at the time. <br /> 'rl� <br /> 4 <br /> Y ?; <br /> ,Ifs <br /> ` John Kuchinski noted the lack of an official Town ma I +„ <br /> p and <br /> r; stated access from Barnstable Road would be necessary for reasons <br /> of safety. He also noted that as shown, it is "too long, " To , <br /> have adequate access to the lots beyond Nelson Circle, additional {' <br /> access is required. <br /> The chairman requested figures f <br /> � �g be provided to the Planning <br /> Board, as well as review of Minutes of the r <br /> p for approval in <br /> order to understand the Board' s decision. <br /> Call, <br /> !r' <br /> i <br /> Attorney Karrine acknowledged concern on the are ''"+ <br /> g part of some of <br /> the homeowners relating to the creation of a major thoroughfare, } <br /> and indicated his belief the homeowners would like the I; � <br /> � . <br /> possibility of using the road as an emergencyaccess rather than drik <br /> creat in a major or r subdivision.= '!. <br /> r g 7 = roadway through the subdivision. He requested 116b <br /> Board consideration of this suggestion. <br /> q, John Kuchinski stated he did not view the road as a iilk ' <br /> .t <br /> potential major thoroughfare, as there would only be residential { � <br /> traffic. <br /> a' <br /> 'fL <br /> f4 <br /> Dennis Balzarini commented this to be a reasonable request. J0 ` <br /> r:r+: <br /> f•tif <br /> rya Chance Reichel stated his concern was to determine whether =e <br /> 3 off r <br /> ;Yv or not the road is passable. <br /> The Chairman suggested this matter be discussed, further er at <br /> h <br /> a next scheduled Planning Board Meeting. In the interim, he I <br /> suggested the Board review the previous Minutes (1994-earl 1995 } <br /> and y �review of the proposal by the Consulting in Engineer. <br /> . <br /> g g � <br /> U Mr. Bauer provided a set of Plans for the Board. In � �` <br /> Imo:; <br /> response to a question regarding road construction made by the <br /> Chairman, Mr. Baxter stated the grades would basically remain�_. g y a n the �� } <br /> n1r same, the drainage however, would have to be updated to standard <br /> { (solid catch basins rather than leaching catch basins etc. ) . ,W <br /> ' e co,The lots themselves would remain the same twelve (12) t the <br /> cut �� ! <br /> Off point, seventeen (17) total. Mr. Baxter indicated this to be ` <br /> s a good stopping paint if Miller Circle is to be used as a turn <br /> around. �V <br /> The Board agreed to continue Discussion of this matter at y <br /> the March 18, 1998 Planning Board Meeting, at 7:15 p.m. (This <br /> Matter concluded at 7:13 p.m. ) <br /> ,,,,,•„ �, <br /> Release of Covenant `+ <br /> Wi l l owbend Development Corporation-Shoestring Bay <br /> ti 45 i,l <br /> i <br /> 6, <br />