My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/19/1998 PLANNING BOARD Minutes
>
08/19/1998 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2022 5:10:08 PM
Creation date
1/28/2022 9:41:07 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
08/19/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> the capacity is there theoretically, they cannot use it because ` <br /> DEP has not permitted it. As a result there is a condition <br /> within the Planning Board Decision recommending that when `� <br /> ,:,, <br /> they reach two hundred fifty-one (2 51) units, they cannot <br /> continue any further without DEP approval to contribute << , � <br /> additional flow to the plant. <br /> ...� " <br /> (There was some discussion regarding obtaining the DEP <br /> upgrade approval. ) <br /> Water M I 1 <br /> 1 <br /> The Chairman requested some information be presented, on Y <br /> the issue of water, at which point Attorney McElhinney deferred <br /> to Thomas Hardman. <br /> y4 <br /> Makin references t o the Plan Mr.. Hardman reported the <br /> g p <br /> water is being designed to connect into the Phase I extension, <br /> Attorney McElhinney reported they have met with the 'water <br /> District and are currently in the process of preparing a €, <br /> Memorandum of Understanding. willowbend has agreed to connect a 11 <br /> number of abutters who have expressed a desire to do so. He did r <br /> state that not everyone is interested in obtaining public water. ; <br /> In any event, Attorney McElhinney stated the water will be ,3;5 <br /> made available at minimal cost for anyone wishing to hook into �. <br /> the District. <br /> Mr. Hardman stated the size, design, and materials all `. r <br /> conform to water District standards. <br /> The Chairman inquired as to there being any water District °f•� <br /> concerns regarding capacity/additional lots, to which Attorney <br /> McElhinney responded, ':No <br /> Traffic ' 1 <br /> The Chairman addressed an earlier statement made regarding aL <br /> recommendation by the DPW Director to close an egress. The ::.�::� <br /> Chairman stated the Board would require further information on " <br /> the total effect of additional traffic on other points -of egress. <br /> The Chairman asked the Consulting Engineer his opinion with +k' <br /> regard to traffic issues/concerns. , <br /> Mr, Rowley advised the Fire Chief be contacted in order to ` <br /> determine his preferences as to which areas should be <br /> closed/gated with respect to the upper end of the property under " <br /> discussion. He also noted the entrance off Simons Narrows Road <br /> to be a standard forty (40) layout. He suggested there be <br /> sufficient room within the layout to accommodate the gatehouse. , <br /> landscaping, etc. , while allowing sufficient room for emergency <br /> p g. <br /> vehicles. SAe�i <br /> .-4- <br /> �lil+ <br /> I� <br />
The URL can be used to link to this page
Your browser does not support the video tag.