Laserfiche WebLink
JU <br /> ��± I <br /> who has strongly advised the Town adopt a bylaw in this regard. <br /> The Town Planner reviewed the Permit Process, Height <br /> Restrictions/Regulations, Location and. Dimensional Requirements, ' <br /> and Exemptions. <br /> , <br /> s <br /> There was some discussion regarding is � <br /> g g the sue of Fall zones/ <br /> Setbacks. It was agreed to delete the final sentence of (7) (a) <br /> Page `34- • <br /> James Dorgan suggested revising the proposed. Bylaw to limit <br /> areas to commercial property exclusively, as a means of ' <br /> protecting the residential areas. It was noted that there are tF <br /> areas of commercial/industrial zones adjacent to residential <br /> areas. <br /> The Town Planner continued to review Flexibility, Design <br /> Standards, Visibility/Camouflage, Camouflage by vegetation, <br /> Color, Equipment Shelters, Lighting and Signage, Historic A l, <br /> Buildings and Districts, Scenic Roads and. Vistas, Environmental <br /> Standards, Radiofrequency Radiation Standards; Application <br /> Procedures, and Application Filing Requirements. � <br /> There was some discussion regarding profile elevations. <br /> � r <br /> i <br /> The Town Planner continued to review the remainder of the <br /> proposed Bylaw, Balloon or Crane Testing, Co-location, <br /> Modifications, Monitoring and Maintenance, Abandonment or � <br /> Discontinuation of Use, Reconstruction or Replacement of Existing <br /> Towers and Monopolies, and Term of Special Permit, ; <br /> MOTION: Chance Reichel made a Motion to table discussion on <br /> the wireless Facility Bylaw in order to reconvene the matter of <br /> Discussion-Carl Grassetti/Northla.nd-Stratford Ponds-Final Plans Ah <br /> for Bishops Park; which Motion was seconded by Dennis Balzarini <br /> and so voted unanimously. <br /> The Vice Chairman recognized Carl Orassetti, who stated he <br /> has provided Mr. Rowley with drawings. The Vice Chairman read <br /> into the Record a copy of letter received from Charles L. Rowley, ! <br /> PE, RLS, dated September 2, 1998, to the Attention of Patrick <br /> Coffey, Chairman, Regarding Stratford Ponds: "I have reviewed <br /> the plans submitted for the revisions to the Stratford Ponds <br /> project, namely Mayfair Court and Windsor Point. It is my <br /> opinion that the adjustments that have been made are not <br /> significant and that there are no major engineering issues in <br /> this case. The applicants engineer, David Thulin, PE has <br /> indicated that he is working on a grading solution to the area ' '� I# <br /> around the flaired end section FES-1 so that erosion will not be <br /> a problem. It would also be advisable that during the <br /> construction phase, the proposed sewer cleanouts be cross-ties to <br /> building corners as a permanent written record for future use. <br /> PVC pipe is to be used for the cleanouts which will be grass �� <br /> itE <br /> Iu <br />