My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/20/1998 PLANNING BOARD Minutes
>
05/20/1998 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2022 5:04:29 PM
Creation date
1/28/2022 9:58:21 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
05/20/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. 4 <br /> Mr. Fitch stated the "as built" Plan would provide this <br /> information. <br /> PlanningBoard Members suggested <br /> ggested a revised profile prior to ; <br /> construction be submitted to the Planning Board for approval, to t' S <br /> which Mr. Fitch agreed. s <br /> Mr. Fitch informed the Board that Mr. Taylor indicated he ,: , , <br /> would provide the Planning Board with a Memo. When Mr. Fitch ' sa <br /> inquired about it, he was told that the Memo had not been i <br /> prepared, but that Mr. Taylor would do so. Mr. Fitch stated <br /> he would submit a revised Plan, as requested. (This matter <br /> concluded at 6:40 p.m. ) <br /> Discussion ,r+' <br /> Anthony Lacava/Baxter & Nye-Quashnet valley-Snead Drive Extension <br /> Mr. Kuchinski recognized Mr. Baxter, who identified himself � . • <br /> for the Record as, Dick Baxter, Baxter & Nye. : <br /> Mr. Baxter stated he has revised the Profiles, and submitted * #� <br /> Drainage calculations for Mr. Rowley' s review for that section of <br /> Snead Drive that is not going to be modified, the original <br /> section under discussion, which is to be extended approximately ! a ' <br /> Five Hundred (500 ft. ) Feet, as well as Miller Circle. Mr. <br /> Baxter further stated the type of drainage has been revised to lip <br /> solid catch basins going into leach its off thepavement. <br /> 9' g pits <br /> (There was some discussion regarding the proper submission ' <br /> of the Application. ) <br /> Mr. Baxter submitted two (2) copies of the Profile; one for • • <br /> Mr. Rowley, and the other for the Planning Board. (This matter <br /> concluded at 6:46 p.m. ) <br /> •+'' <br /> r <br /> Public Hearing 41' <br /> John Druley-Quaker Homes - Great Oak Road s Approval of 3-Lot Definitive Subdivision Plan-Salt Pond Estates <br /> The appointed hour having arrived, Mr. Kuchinski called the <br /> 6:45 p.m. Public Hearing to order. Mr. Kuchinski noted this a <br /> matter is a continuation from May 6, 1998. Mr. Kuchinski also +� <br /> noted a letter to the Town Planner, "I am on the Planning Board ; <br /> Agenda for Hearing regarding my three-lot subdivision, May 20, -� �'� <br /> 1988. (Name) My Engineer for the Water Quality Study required <br /> for final approval by your Board has been out of the country most a YP <br /> Oethe past two-weeks and has not been able to complete the ; *� <br /> required study. would the Board be so kind as to allow me two <br /> more weeks to finish the study. I regret this delay regarding my <br /> final Hearing. The eminent domain taking by the Town of Mashpee <br /> Of this parcel has really delayed my completion schedule for ;. <br /> Definitive approval. Thanks for your consideration in this 11) <br /> matter. Sincerely, John L. Druley. " ll& <br /> -2- !` <br /> � t <br /> uM. . <br /> ailr <br /> i <br /> 'ilk <br />
The URL can be used to link to this page
Your browser does not support the video tag.