Laserfiche WebLink
,III <br /> r <br /> road with the option of expanding to a four (4) lane, if ' <br /> necessary. Mr. Megathlin requested a consensus from the Town on <br /> this proposal prior to submission to any of the regulatory <br /> authorities. <br /> Mr. Megathlin explained the proposal calls for a signal at <br /> Donnas Lane, which Mashpee Commons is obligated to pay for in <br /> its entirety. The curb cut going into the ice cream/mini golf <br /> course is to be closed. (Mr. Megathlin was making references to <br /> the plan at this point. ) Mr. Megathlin stated the proposal does <br /> not meet the criteria for warrants, therefor there is no signal <br /> at present. James Dorgan requested the opportunity to review the z;a <br /> report Mr. Megathlin was making reference to. , <br /> Mr. Megathlin was making references to access points, <br /> medians, present pavement, and areas that will be utilized within <br /> the right of way. <br /> The Town Planner clarified the Comprehensive Plan recommends r ;, <br /> in the short term, attempting to acquire sufficient layout along <br /> Route 28, in order to accommodate four (4) lanes at a future <br /> date. The Comprehensive Plan also includes a series of <br /> .Mh <br /> recommendations regarding intersection improvement. The issue <br /> being how to improve the intersection, not necessarily the number y <br /> of lanes for capacity on state highways. The Town Planner <br /> further stated the Comprehensive Plan recommends a signal at the lop <br /> intersection under discussion. For safety reasons, the Town <br /> Planner expressed his opinion to be that if there is to be an <br /> access, a signal would be required. dr.. <br /> t <br /> Mr. Megathlin referred to the four (4) lane plan, which <br /> would require an acquisition of land, between nine and eighteen <br /> feet, which proves to be problematic. Mr. Megathlin then made <br /> reference to the site plan in terms of meeting the parking •�''' <br /> requirements. p <br /> 41' <br /> James Dorgan requested an engineered traffic plan of the <br /> intersection showing the various lane configurations. Mr. ,. <br /> Megathlin stated the information on Shellback Way and Donna's <br /> Lane is provided for in the traffic report. <br /> a <br /> (There was lengthy discussion regarding traffic issues a <br /> within the area under discussion. ) r <br /> A10' <br /> The Connector Road: Mr. Megathlin made reference to the � � -q <br /> Local Comprehensive Plan proposal for an interconnecting road r,P,,,a <br /> from the Mashpee Industrial Park to East Steeple Street in an <br /> attempindicated the <br /> o alleviate <br /> traffic <br /> location of Route <br /> saidroadway. <br /> Megathlin then <br /> proposed y• �. <br /> Mr. Kuchinski raised some issues of safety concerns at this M, <br /> Point. ' <br /> (There was some discussion regarding the location of curb II41l, <br /> cuts on Donna' s Lane. ) -6- rs <br /> nM► . <br /> .li�� <br /> s <br /> 0'' <br /> w <br />