Laserfiche WebLink
' r <br /> A <br /> Traffic Mitigation Funds: Mr. Megathlin stated he is <br /> partial to the concept of providing a sidewalk (8 to 10 feet i 4 � <br /> wide) on Great Neck Road South. �. <br /> Groundwater and Nitrate Loading: Mr. Megathlin stated he is <br /> is aware of the fact that the quality of the Mashpee River must " <br /> be improved. He proposed investigating means to assist adjacent <br /> properties experiencing septic/septage problems. He also !. <br /> mentioned an interest in tying into the proposed pipeline. <br /> • ;. <br /> Mr. Megathlin requested a second appearance before the Board ,.f• . <br /> at such time as he will be able to answer questions regarding <br /> nitrate, landscaping, and architecturals. <br /> Mr. Megathlin stated this proposed outlet center is aimed <br /> directly at the issue of attracting shoppers to the Cape ($126 <br /> million dollars) . He also pointed out the fact that Cape Cod is M <br /> the only New England region that does not have a premium outlet. •• <br /> Mr. Megathlin explained that outlet stores offer national <br /> brand items priced between thirty and sixty (30* and 60*) + - <br /> percent below retail. <br /> Mr. Megathlin also mentioned a food court is to be proposed Wv <br /> as part of this project, as well as a restaurant. <br /> !s <br /> Mr. Kuchinski thanked Mr. Megathlin for his presentation and <br /> stated the Board would look forward to hearing from him regarding <br /> the updated reports. w fir, <br /> Mr. Talanian was present at the Meeting, and it was at this <br /> point that he spoke briefly by way of introducing himself to the r <br /> Board. (This matter concluded at 8:22 p.m. ) <br /> Release of Covenant-Steven J. Pizzuti <br /> Bay Ridge, Simons Narrows Road-Release of Lot 5 and all remaining <br /> lots from Covenant dated September 6, 1984 <br /> There were no representatives of this matter present. The <br /> Town Planner provided and made reference to ANR Plan entitled, •"'i' <br /> "Plan of Land located in Mashpee, MA. , Prepared by Mashpee s <br /> Investors Trust, dated July 16, 1984, by Cape & Islands <br /> Surveying. <br /> !'v <br /> After some discussion, the Board determined this matter <br /> should be postponed until such time as Applicant could provide <br /> the Planning Board/Department with specific information and " 4 <br /> proper paperwork, as required. <br /> The Town Planner introduced a request received by the <br /> Waterway Commission in the amount of Thirty-Four Hundred <br /> ($3,400.00) Dollars for the continued study of Popponesset Bay. <br /> 1,pE, <br /> 4, <br /> nr^ <br /> av <br />