Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> Mashpee Housing Authority and Housing Assistance Corporation <br /> Breezy Acres Phase II—570 Old Barnstable Road <br /> Mashpee, MA 02649 <br /> CP-10-29 <br /> 2. Except as otherwise required by the conditions imposed by this <br /> Comprehensive Permit, including Condition No. 1, above, or by the Final Site <br /> Plans as defined below, the project shall be developed, constructed and <br /> completed in conformance with the Plans. <br /> 3. Final, fully designed site plans (the "Final Site Plans") shall be submitted to <br /> the Board, the Board's designated engineer and the Mashpee Building <br /> Inspector no less than 45 days prior to the application for building permits for <br /> the commencement of construction of the Project. The Final Site Plans shall <br /> be of a quality and level of detail sufficient to allow the Building Inspector and <br /> the Board's engineer to review the Final Site Plans for consistency with the <br /> Plans, the terms of this Comprehensive Permit, legal requirements and <br /> industry standards. No construction shall commence and no building permits <br /> shall issue under this Comprehensive Permit until the Board's Engineer has <br /> approved the Final Site Plans as being in conformance with this Decision, said <br /> approval to be in writing. If no written response or comments have been given <br /> to the Applicant concerning the Final Site Plans within forty-five (45) days after <br /> the Final Site Plan submission date, the Final Site Plans, as delivered, will be <br /> deemed to have been approved, provided that, for good cause shown, the <br /> Applicant shall allow a 30-day extension of such approval period. Nothing <br /> herein shall be construed to limit or otherwise affect the Mashpee Building <br /> Department's authority and obligations under the State Building Code. The <br /> Final Site Plans shall include, but not be limited to, complete construction plans, <br /> final stormwater management plans, an erosion control plan, utility plans <br /> (including sewer connections), a landscaping plan, and a lighting plan, as well <br /> as all other plans that are customarily submitted for projects of this scope, as <br /> may be determined in the discretion of the Board's engineer. The 45-day time <br /> period under this paragraph shall not commence if the Board's engineer notifies <br /> the Applicant in writing that the Final Site Plans are incomplete. <br /> 4. Prior to the commencement of construction, the Applicant shall contact the <br /> Board's engineer for the purpose of developing a schedule and protocol for <br /> construction and inspections. During the construction of the Project, the <br /> Applicant shall be required to meet with the Board's engineer, upon request by <br /> said engineer, to discuss the progress of construction. Failure to attend such a <br /> meeting may be grounds for a stop work order. <br /> 5. The lighting plan shall ensure proper lighting while mitigating, to the maximum <br /> extent possible, any unreasonable light pollution. <br /> 6. The final landscaping plan shall exhibit a detailed planting list. All plantings <br /> shall be well-maintained by the Applicant. <br /> L <br /> 5 <br />