Laserfiche WebLink
Mashpee Zoning Minutes <br />Board of Appeals December 9, 2009 <br />will be an improvement to the property. The applicant proposes to raze the <br />existing dwelling and replace it with a two-story, five -bedroom dwelling. This will <br />eliminate the current non-conformance to the wetlands setback requirements. The <br />existing cesspool will be removed, relocated and replaced with a new Title V <br />Septic System, a substantial improvement to the property and surrounding <br />neighborhood. Proposed installation of a series of drywells will direct run-off from <br />the new dwelling away from the abutting wetlands. The new dwelling will be built <br />in compliance with flood zone regulations. This will also be an improvement of <br />the existing situation, while addressing health and safety concerns in the event of a <br />significant storm event. It will also conform to all applicable setback and lot <br />coverage requirements. Attorney Kirrane also mentioned the current dwelling's <br />assessed value in comparison to the land assessment. The building is assessed at <br />what amounts to little more than 6% of the land assessment. Attorney Kirrane said <br />that: "Given the land's valuation in a waterfront neighborhood, it is consistent that <br />a property owner would want to construct a dwelling having greater value to justify <br />the cost of said land and the taxes levied by the Town". <br />Mr. Nelson questioned the first floor elevation and height of the proposed <br />dwelling. Mr. Slavinsky said that it will be in compliance with flood zone <br />regulations. Mr. O'Neill clarified the proposed height of the building and the fill <br />and grading of the lot. <br />Next door abutters Richard and Mercedes Kearney residing at 429 Monomoscoy <br />Road submitted a letter to the Board, which in part stated: "We have seen the <br />preliminary plans for the new house and fully support the development. We <br />consider it an improvement to the neighborhood as well as the environment". <br />Mr. Blaisdell made a motion in compliance with 174-17 of the Zoning By-laws for <br />a Finding of Fact that the request for a Special Permit "shall not be substantially <br />more detrimental than the existing nonconforming structure or use to the <br />neighborhood and that there is adequate land area to provide sufficient parking and <br />setbacks as may be required". Mr. Blaisdell then made a motion to grant the <br />Special Permit under Sections 174-20, 174-24C, 174-58 and 174-59 of the Zoning <br />By-laws. Mr. Nelson seconded. All were in favor. This is conditioned upon <br />compliance with Cape & Islands Engineering Plan entitled: Proposed Site Plan <br />Located in Mashpee, Mass., Prepared for Jeremy Stevenson, Date: Oct.27, 2009, <br />Scale 1" = 20', File: I I IMA, PCS File". <br />el <br />