Laserfiche WebLink
FINAL VERSION . <br /> e Floorplans: (1/8" or 1/4... <br /> i. Rooms dimensioned and labeled <br /> ii. Windows and doors with swings indicated <br /> iii. Overall dimensions <br /> Elevations: (1/8" or .1/4") showing: <br /> i. Principal materials specified <br /> ii. Floor, eaves, and ridge heights, relative to grade <br /> iii. Roof slopes, noted <br /> Two building sections: (1/8". or 1/4") <br /> E Variations (if applicable): If a variation is requested, please submit a description <br /> of variations and justification based on merit or hardship <br /> C Project data-to include: transect zone per the Regulating Plan,required setbacks <br /> and easements, and building footprint area(in Urban Code) <br /> D. Note: Study model, (1/16" chipboard, medium gray or brown uncoated cardboard)may <br /> be requested by the.Office of the Neighborhood Architect as required for schematic <br /> design review <br /> Upon written request, any materials submitted at this phase shall also be provided to the Mashpee <br /> Zoning Board of Appeals. The Zoning Board of Appeals, in consultation with consultants or <br /> other local officials, may make comments with respect to the submitted materials and the <br /> Neighborhood Architect shall take such comments into consideration when reviewing the same. <br /> Any comments from the Zoning Board of Appeals ivill be limited to compliance with the <br /> Comprehensive Permit and the Code. Any such comments by the Zoning Board of Appeals must <br /> be submitted to the Neighborhood Architect within 30 days of submission of the materials. <br /> STEP 6: CONSTRUCTION DOCUMENTS REVIEVi7 <br /> Be sure to submit construction documents for review before construction bidding. This review <br /> checks the construction documents for compliance with the. Code and verifies that <br /> recommendations made at the Schematic Design Review have been incorporated. Compliance <br /> with_applicable local regulations and building codes is the responsibility of architect and.builder._ <br /> The Neighborhood Architect will stamp the drawings upon approval. <br /> A. FORM A: Approved Sketch Review Application <br /> B. FORM B: Approved Schematic Design Review Application <br /> C. FOMI C: Construction Documents Review Application <br /> D. Construction documents, on 24" x 36" sheet size or in electronic format, as outlined below: <br /> ® Architectural; structural; mechanical, electrical, and plumbing(M.E.P.); and landscape <br /> plans as required for construction, steal I be acceptable for the Construction Documents <br /> Review. <br /> All specific building elements subject to approval of the Neighborhood Architect, per the <br /> Architectural Code; shall be delineated and noted sufficiently for review. <br /> ® The Office of the Neighborhood Architect reserves the right to request additional <br /> information if required and shall not be held responsible for delays incurred. <br /> The Neighborhood Architect will approve, approve with stipulations, or deny construction. The <br /> materials approved at this final review will be your working construction documents and cannot. <br /> be changed without the approval of the Office of the Neighborhood Architect. Plans for showing <br /> building elevations and orientation on the lot shall be simultaneously submitted to the Mashpee . <br /> 6 <br />