Laserfiche WebLink
t} <br /> The Vice Chairman entertained a formal Vote and Motion be <br /> made authorizing notification to the Building Inspector that the <br /> Planning Board has determined this is not a substantive change, " <br /> wherein the square footage is reduced, via a phone call or memo dM' <br /> from the Town Planner. <br /> MOTION: Martin Meijering made said Motion; which was W. <br /> seconded by Robert Govoni and Voted as follows: In favor-Patrick ' <br /> Coffey, Martine Meijering, Robert Govoni. Abstaining from the <br /> Vote-Dennis Balzarini and John Kuchinski. a.. .' p <br /> Thomas Fudala requested this matter be conducted as an <br /> official Board Action, in writing, submitted to the Building 4 , "{ <br /> Inspector. <br /> w� <br /> (There was some discussion regarding language to be includeddi'; <br /> in the Master Plan and presentation of a Willowbend Master Plan. ) <br /> Patrick Coffey determined that a copy of the revised Plan is <br /> to be recorded by Applicant. Attorney McElhinney stated he would <br /> record an Attorney' s Affidavit. <br /> The Board Members authorized the Vice Chairman, Patrick <br /> Coffey, to notify the Building Inspector in writing, of the <br /> Discussion, Decision and Vote with regard to the Willowbend Al <br /> matter addressed at this Meeting. ' <br /> (The Special Permit-Willowbend Land Development matter <br /> concluded at 8:35 p.m. ) <br /> Consulting Engineer, Charles Rowley, mentioned that he had <br /> been informed of plans to pave Stirling Drive (willowbend) . Upon <br /> his inspection of the property he found there are two catch <br /> basins that were not in place when he made his original <br /> inspection. They are now in place, covered with gravel, and <br /> ready for mix. He is concerned for the time when a release for i. <br /> the lots and his signature will be required. Mr. Rowley is not " <br /> able to substantiate the basins were ever connected to the <br /> leaching system. <br /> Mr. Besse apologized to Mr. Rowley for the actions of the ' <br /> contractor and promised to address the issue. Mr. Besse asked <br /> how he would be able to accommodate Mr. Rowley, who responded, "4a„ <br /> " . . .short of digging it up, there is no certification that I can <br /> give for the release of those lots. . . <br /> Mr. Rowley stated to Mr. Besse that he needs to make sure i1 <br /> the connections from the basins to the leaching systems are made �j ! ` <br /> and proper and in conformance with the Plan. <br /> Mr. Besse assured Mr. Rowley that he would speak to the <br /> contractor and see that whatever is necessary to rectify this-11- d�dal,�l <br /> � .: <br /> is <br />