My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-Annual Town Report
>
2017-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 5:05:02 PM
Creation date
6/23/2022 3:45:39 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Unless otherwise posted, the Planning Board Library, Police Station, Fire Substation, and DPW; <br /> conducts public meetings on the first and third refurbishment of the gym floor at the Middle/High <br /> Wednesdays of each month at 7:00 p.m.at the Mashpee School; and bathroom renovations at the DPW. <br /> Town Hall.Planning Board meetings are televised live <br /> on Chanel 18, and public information is always Additional projects are proposed at the KC <br /> available on the Planning Department page of the Coombs School (HVAC and window), Middle/High <br /> Town's website at www.mashpeema.gov. School (HVAC and building envelope), and DPW <br /> (vehicle exhaust system)in 2018. <br /> Respectfully submitted, <br /> Mary Elaine Waygan,Chairperson QUASHNET SCHOOL PROJECT <br /> David Kooharian, Vice-Chairperson The Massachusetts School Building Authority <br /> Joseph Cummings,Clerk (MSBA) approved funding through their Accelerated <br /> Dennis Balzarini Repair Program for replacement of the windows,doors, <br /> David Weeden and roof at the Quashnet School. The total budget <br /> Robert Hansen,Associate Member approved for the project was$10,477,884 of which the <br /> MSBA will reimburse 37.95% of eligible costs or <br /> $3,781,952. Borrowing by the Town of the remaining <br /> $6,695,932 was approved at the May 2017 Annual <br /> Town Meeting. This represents the maximum amount <br /> Report of the to be paid by the Town. With the completion of the <br /> Planning & Construction project, approximately 85% of the exterior of the <br /> Committee building will be new. <br /> Design plans for the project were completed over <br /> To the Honorable Board of Selectmen and Citizens the summer/early fall with the Owner's Project <br /> of the Town of Mashpee: Manager and architect/design team. The Town issued <br /> a Request for Bids for construction in October and <br /> The Planning & Construction Committee was received bids in December. A contract was awarded <br /> appointed by the Board of Selectmen in August 2005 to for the General Contractor to J.J.Cardosi,Inc.of East <br /> oversee capital improvements to the Town's facilities Providence, RI. Construction is scheduled to start in <br /> as well as the construction of new buildings. Below is late Spring 2018 and continue over the summer with <br /> a summary of projects from the past year. final completion by November 2018. <br /> CAPITAL IMPROVEMENT BOND For other building-related projects,please refer to <br /> The May 2017 Annual Town Meeting approved a the DPW annual report. <br /> $1.5 bond for completion of capital improvements at Respectfully submitted, <br /> various Town buildings and Town roads. The specific <br /> building improvements had been identified through the Steven Cook,Chairman <br /> Joseph Brait, Vice-Chairman <br /> 6-year Capital Improvement Plan which is updated <br /> annually. Thomas O'Neill <br /> Geoff Gorman <br /> Two of the projects identified,conversion of the <br /> interior lighting at the Quashnet School and the KC <br /> Coombs School to LED,received funding through an <br /> incentive from the Cape Light Compact and a grant <br /> from MA Department of Energy Resources Green <br /> Communities program. Both projects were completed <br /> in Summer 2017. Other projects completed in 2017 <br /> with the bond were the replacement of the emergency <br /> generator at the Quashnet School; upgrade of the - <br /> ` <br /> security cameras and/or access control systems at the <br /> 129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.