Laserfiche WebLink
The Commission and other Town representatives meaning that significant sewer construction will still <br /> had engaged in discussions over the last few years with be required in those sub-watersheds and is proposed in <br /> the Towns of Sandwich,Falmouth and Bourne, along the first two 5-year phases). As each 5-year phase is <br /> with representatives of Mass Development and Joint completed and water quality results become known,it <br /> Base Cape Cod,around the use of wastewater treatment may be necessary to construct portions, or all of the <br /> and discharge facilities on the Base to accommodate later phases of the proposed sewer facilities if the <br /> some of our water quality improvement requirements at shellfish option does not produce the hoped-for results. <br /> existing or expanded facilities on the Base. Phase 2 of We continue to be optimistic that such will not be the <br /> our Plan calls for wastewater from most of the western case.The Department of Natural Resources is making <br /> part of the town to be sent to the treatment plant on the steady progress with shellfish propagation and seeding, <br /> Base,if it becomes available. Mass Development had although the lack of funding for projected seeding in <br /> been considering appropriate mechanisms by which it Spring 2019 will set that work back a bit. <br /> might take over ownership of,and responsibility for,the <br /> wastewater and other utilities on the base, which are Both the wastewater treatment and shellfish <br /> currently managed by the Air Force.However,the Baker propagation portions of the Plan are falling <br /> administration has withdrawn Mass Development from significantly behind the Plan's anticipated schedule due <br /> that project and, although the surrounding Towns to lack of funding and the lack of a decision by the <br /> continue to seek access to the Base facilities,the future Selectmen regarding the appropriate management <br /> of that option is now rather uncertain. structure for construction and operation of the Sewer <br /> system. The long-discussed proposal for the Mashpee <br /> The WNMP describes work to be done in five 5- Water District to become a Water and Sewer District to <br /> year phases.As each phase is completed,the condition implement the wastewater utility portions of the Plan is <br /> of our waterways and other factors will be analyzed to still strongly supported by the Commission.However, <br /> determine how well the plan is working toward we will obviously follow whatever path is determined <br /> achieving the TMDLs and whether adjustments need by the Selectmen and Mashpee voters.In any case,it is <br /> to be made to the Plan (a process referred to as hoped that the Town will settle soon on a funding <br /> "adaptive management"). This adaptive management program and schedule so that we can begin to address <br /> approach is particularly important as the Plan relies our wastewater facility needs. <br /> heavily on removing a significant portion of the water <br /> column nitrogen load through seeding and commercial The Commission now finds itself four members <br /> harvesting of large numbers (millions) of shellfish in short as former Commissioner Thomas Burns has <br /> Hamblin and Jehu Ponds,Great and Little Rivers and resigned and moved to Florida.We thank him sincerely <br /> Ockway Bay, and a significant expansion of current for his efforts while on the Commission. Any <br /> oyster propagation and harvesting efforts in the volunteers to fill those four positions will be much <br /> Mashpee River,Shoestring Bay and Popponesset Bay. appreciated. <br /> The oyster propagation work is also being enhanced by <br /> the Wampanoag Tribe. In conjunction with sewering As noted in previous years,the Commission and <br /> and other nitrogen reduction measures such as Mashpee officials and residents have serious work cut <br /> stormwater bio-retention areas, development controls out for us to identify funding and financing strategies <br /> and land purchases to reduce"buildout"population and for developing the facilities and practices needed to <br /> other measures, shellfish seeding and commercial clean up our waterways. It took decades for our <br /> harvesting on a large scale may make meeting the waterways to get into their current poor condition and <br /> TMDL targets for Hamblin and Jehu Ponds and Great it may take a longer time to clean them up,but we have <br /> River possible on their own,and also ultimately reduce a Plan and must summon the will to fund it. Your <br /> the area of the Town that has to be sewered in other continued support for our work and participation in this <br /> watersheds(thus reducing resulting costs significantly). decision-making process, as in past years, will be <br /> Should the shellfish prove as effective as hoped,only sincerely appreciated. <br /> the first two or three phases of sewer facility <br /> construction would be required to meet the TMDLs Respectfully submitted, <br /> (shellfish cannot meet the TMDLs on their own in the F.Thomas Fudala, Chairman <br /> Mashpee River and Shoestring Bay sub-watersheds,or Joseph N.Lyons, Vice Chairman <br /> at all in the Quashnet/Moonakis River sub-watershed, Bradford H.Pittsley, Clerk <br /> 167 <br />