My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-Annual Town Report
>
2018-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 5:02:38 PM
Creation date
6/23/2022 3:46:34 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Works on Ramp Floats and walkways, signage and <br /> Report of the dinghy rack storage at our Ockway Bay Ramp, our <br /> Waterways Commission Pirates Cove — Ed Baker Ramp and our Great River <br /> Ramp.Our DPW is continually making improvements <br /> to all of our Town Ramp areas and is to be com- <br /> To the Honorable Board of Selectmen and the citi- <br /> zens mended for the fine job/work they have provided to <br /> of the Town of Mashpee: the Town. <br /> The Mashpee Waterways Commission presently We conducted an informal interview with <br /> meets on a monthly basis (2°d Tuesday, 9AM) at the approximately 25—30 Great River Ramp users both in <br /> Town Hall to deliberate on Waterways related topics. Town and out of Town users and we were pleased with <br /> Our goal is to maintain and improve our waterways the positive commentary we received. There were no <br /> thus improving safety of boaters on the bays, lakes, complaints even when asked for improvement sugges- <br /> ponds and rivers. We also strive to help the improve- tions. <br /> ment of our water quality with dredging while paying <br /> attention to effects of climate change and coastal COMPREHENSIVE DREDGE PERMIT <br /> resilience issues. <br /> We filed for a Town Comprehensive Dredging <br /> We work closely with our Harbormaster, the Permit back in 2013. We followed that through the <br /> Shellfish Constable (who are a part of the recently years with our consulting engineers and the many <br /> established DNR Department) and the Department of State and Federal agencies with whom we have to <br /> Public Works. We oversee Improvement Dredging interface. That 10 year permit was finally secured in <br /> projects, maintenance dredging projects, the water September of 2016. <br /> quality measurement process,and public access to the <br /> waters. We continue to review future embayment pro- ADDITIONAL DUTIES of the WATERWAYS <br /> jects in Waquoit and Popponesset Bay. COMMISSION <br /> Members of the Commission serve as liaisons on <br /> MAINTENANCE DREDGING the following committees: <br /> Our dredging efforts in 2018 were consumed by <br /> the dredging of the Popponesset Approach Channel in Mashpee/Wakeby and John's Pond, Poponesset <br /> Nantucket Sound. These projects enable us to replen- Bay, Waquoit Bay, Water Quality/Water Sampling <br /> ish the sand of the Popponesset Spit that is the primary Report, Barnstable County Resources Committee, <br /> protector of our Bay and is a primary nesting area for Barnstable County Dredge Committee, Mashpee <br /> m Sewer Committee and Public Access. <br /> migrating Plovers and Least Terns. <br /> We spent a lot of time and effort to move for- We want to thank the Town Manager, Assistant <br /> ward with preparation of our Little River Expansion Town Manager, Administrative Assistant, the Board <br /> Plan for Little river and Great River. The expansion of Selectmen as well as the Harbormaster, <br /> plan goal is to extend the existing Little River Channel Conservation Agent, Shellfish Constable and the <br /> south into Waquoit Bay and north into Hamblin Pond DPW Director for sharing their expertise and provid- <br /> and north up Great River into Jehu Pond. We will also ing their assistance in all that we do. We all strive to <br /> connect the Great River Ramp that is in final stages of do our job well for the benefit of the Town and the <br /> completion to the Great River Channel. This project public. <br /> would be an improvement dredge project whereas our Respectfully submitted, <br /> existing Little River Channel is a maintenance dredge <br /> project. We are planning a maintenance dredge of the Kenneth Bates,Chairman <br /> Little River Channel to be completed early 2019. Donald MacDonald, Vice Chairman <br /> Don Barton,Secretary <br /> PUBLIC ACCESS Al Wickel <br /> Tim Leedham <br /> The Waterways Commission worked in concert Stanton Healy <br /> with the Harbormaster, Shellfish Constable, Steve Mone <br /> Conservation Agent and the Department of Public <br /> 172 <br />
The URL can be used to link to this page
Your browser does not support the video tag.