Laserfiche WebLink
D. Dimensional Criteria systems,the Planning Board may increase the <br /> maximum height as appropriate based on site- <br /> Small, Medium and Large Scale Solar Energy specific considerations. <br /> Systems <br /> 7. Inverters, energy storage systems, and <br /> 1. Small,Medium and Large Scale Solar Energy transmission system substations shall be set <br /> Systems may be accessory to another principal back a distance of at least 200 feet from any <br /> structure or use provided that they satisfy the residence. The Planning Board may reduce the <br /> dimensional criteria and performance standards minimum setback distance as appropriate <br /> contained in this section. based on site-specific conditions. <br /> 2. Ground-mounted solar energy systems shall be E. Special Permits Rules and Application <br /> set back a distance of at least 100 feet from a Requirements <br /> public or private way. The Planning Board <br /> may reduce the minimum setback distance as A Solar Energy System Special Permit shall not be <br /> appropriate based on site-specific granted unless each of the following requirements, in <br /> considerations. addition to the requirements in §174-24 C Special <br /> Permit use, are satisfied: <br /> 3. Ground-mounted solar energy systems shall be <br /> set back a distance of at least 125 feet from any 1. A properly completed and executed application <br /> inhabited residence, and 100 feet from any form and application fee. <br /> property in residential use. For the purposes <br /> of this section, a residence is defined as a 2. Any requested waivers. To this end, as part of <br /> primary living structure and not accessory its Special Permit decision,the Planning Board <br /> structures. The Planning Board may reduce may, at its sole discretion, establish a lot <br /> the minimum setback distance as appropriate coverage maximum that exceeds 20% in <br /> based on site-specific considerations. consideration of site specific conditions. <br /> 3. Name,address,phone number and signature of <br /> 4. Ground-mounted solar energy systems shall be the project proponent, as well as all co- <br /> set back a distance of at least 50 feet from any proponents or property owners,if any. <br /> commercial property or use and 25 feet from <br /> any industrial property or use notwithstanding 4. Names, contact information and signatures of <br /> the provisions of paragraph 2 above (relative any agents representing the project proponent. <br /> to medium and large scale solar energy <br /> systems). The Planning Board may reduce the 5. Name, address and contact information for <br /> minimum setback distance as appropriate proposed system installer. <br /> based on site-specific considerations. <br /> 6. Documentation of actual or prospective access <br /> 5. Ground-mounted solar energy systems shall be and control of the project site sufficient to <br /> set back a distance of at least 50 feet from allow for construction and operation of the <br /> abutting conservation land and any property proposed solar energy system. <br /> not included in the Ground-mounted solar <br /> array application. The Planning Board may 7. Proposed hours of operation and construction <br /> reduce the minimum setback distance as activity. <br /> appropriate based on site specific <br /> considerations. 8. Blueprints or drawings of the solar energy <br /> system signed by a Massachusetts licensed <br /> 6. Fixed tilt Ground-mounted solar energy Registered Professional Engineer showing the <br /> systems shall have a maximum height of 15 proposed layout of the system and any <br /> feet above grade. In the case of single or dual potential shading from nearby structures. <br /> axis tracking Ground-mounted solar energy <br /> 79 <br />