My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-Annual Town Report
>
2021-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 5:02:56 PM
Creation date
6/23/2022 3:47:25 PM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9. Utility Notification: Evidence that the utility (b) Disposal of all solid and hazardous waste <br /> company that operates the electrical grid where in accordance with local, state and federal <br /> a grid-intertie solar energy system is to be waste disposal regulations. <br /> located has been informed of the system owner <br /> or operator's intent to install an interconnected (c) Stabilization or re-vegetation of the site as <br /> facility and acknowledges receipt of such necessary to minimize erosion. The <br /> notification, and a copy of an Interconnection Planning Board may allow landscaping or <br /> Application filed with the utility including a below-grade foundations left in situ in <br /> one or three line electrical diagram detailing order to minimize erosion and disturbance <br /> the solar electric installation, associated of the site. <br /> components, and electrical interconnection <br /> methods, with all Massachusetts Electrical (d) Description of financial surety for <br /> Code (527 CMR§ 12.00) compliant decommissioning: Proponents of ground- <br /> disconnects and overcurrent devices. Off-grid mounted solar energy systems shall <br /> solar energy systems shall be exempt from this provide a form of surety, either through <br /> requirement. escrow account, bond or other form of <br /> surety approved by the Planning Board to <br /> 10. Documentation of the major system cover the cost of removal in the event the <br /> components to be used, including the electric Town must remove the installation and <br /> generating components, battery or other remediate the landscape,in an amount and <br /> electric storage systems,transmission systems, form determined to be commercially <br /> mounting system, inverter, etc. reasonable by the Planning Board, but in <br /> no event to exceed more than 125 percent <br /> 11. Preliminary Operation and Maintenance Plan of the cost of removal and compliance with <br /> for the solar energy system, which shall the additional requirements set forth <br /> include measures for maintaining safe access herein, as determined by the project <br /> to the installation, storm water management, proponent and the Town. Such surety will <br /> vegetation controls,and general procedures for not be required for municipal or state- <br /> operational maintenance of the installation. owned facilities. The project proponent <br /> shall submit a fully inclusive estimate of <br /> 12. Abandonment and Decommissioning Plan: the costs associated with removal,prepared <br /> Any ground-mounted solar energy system by a qualified engineer. The amount shall <br /> which has reached the end of its useful life or include a mechanism for calculating <br /> has been abandoned (i.e., when it fails to increased removal costs due to inflation. <br /> operate for more than one year without the <br /> written consent of the Planning Board)shall be (e) It shall be a condition of any special permit <br /> removed. The owner or operator shall that all legal documents required to enable <br /> physically remove the installation within 150 the Town to exercise its rights and <br /> days of abandonment or the proposed date of responsibilities under the plan to <br /> decommissioning. The owner or operator shall decommission the site, enter the property <br /> notify the Planning Board by certified mail of and physically remove the installation shall <br /> the proposed date of discontinued operations be provided prior to the issuance of a <br /> and plans for removal. The Abandonment and building permit. <br /> Decommissioning Plan shall include a detailed <br /> description of how all of the following will be F. Required Performance Standards: Small, <br /> addressed: Medium and Large Scale Solar Energy Systems <br /> (a) Physical removal of all structures; 1. Visual Impact Mitigation: The site plan for a <br /> equipment, building, security barriers and ground-mounted solar energy system shall be <br /> transmission lines from the site, including designated to screen the array to the maximum <br /> any materials used to limit vegetation. extent practicable year round from adjacent <br /> properties in residential use and from all <br /> roadways. <br /> 80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.