Laserfiche WebLink
16 Great Neck RoadWorth <br />.%lashpee, -Massachusetts 02649 <br />shown on that plan she is reviewing, a cul-de-sac road named Leamar Drive. That would be <br />the only access point. <br />Ms. Faulkner read letters from abutters to get a permit from the DPW and the approval of <br />subdivisions. She knows this area well, while there is very little traffic from the storage facility, <br />and no traffic from the solar, there are many lumber trucks from Stonewood and Cape Cod <br />Coffee. <br />Mr. Kirrane stated Evergreen Circle and Echo Road have a variety of businesses that hold a <br />variety of uses. Currently, there are no uses proposed for this project. Whoever buys it will <br />propose a use and every use has to go before the ZBA. <br />Ms. Faulkner commented it cannot be sold unless there is ingress and egress. There will be <br />30+ trips a day, from their land or that area in general. As part of the curb cut policy, this may <br />be beyond purview of the DPW Director, and she is wondering if the traffic study would dictate <br />that. She noted this area is somewhat dangerous. If you are really unfamiliar driving along and <br />a truck comes out you have to slam on the breaks. <br />Mr. Balzarini asked if their Consulting Engineer, Ed Pesce looked at this. He also asked about <br />firetruck turn radius. Mr. Lehrer stated Ms. Pesce's report is in their packet and he did make a <br />comment relative to turning radius. Mr. Pesce is satisfied with the engineering. <br />Ms. Waygan would like Ed Pesce present at the next meeting and she would like an update <br />from him. <br />Mr. Hansen commented the last time Mr. Kirrane was here there was discussion about the <br />intersecting Sturgis Road, sidewalk, and bike path. Will the traffic impact study touch base on <br />the pedestrian traffic as well as automobile? <br />Mr. Lehrer wrote the scope and noted it would look at all safety concerns. He printed the scope <br />for Mr. Kirrane. <br />Ms. Waygan asked Mr. Lehrer if the plan had been submitted to the Board of Health for <br />preliminary review. She would like the report from the BOH as well as their conclusion. <br />Mr. Lehrer noted it was approved by the Heath Agent from the BOH, as they were not able to <br />meet in quorum to make a recommendation. This requires a timely filing with the Board of <br />Health, and there are comments and an approval, but not from the governing body. It was filed <br />with the BOH in a timely fashion. <br />