-�, MASHPEE ZONING
<br />BOARD OF APPEALS
<br />PUBLICHEARINGS
<br />.- NOTICE
<br />OCTOBER 12, 2022
<br />The'Mashpee Zoning Board of Appeals
<br />will hold Public Hearings on
<br />Wednesday, October 12, 2022, at 6:00
<br />pm in the Events Room at the
<br />Mashpee Public Library
<br />64 Steeple Street; Mashpee; MA
<br />7 Slionershell Wav: Owners, Leanne Clare Orr
<br />and Jesse Richmond Oberst request a Special
<br />Permit under §174-17.1 of the Zoning. Bylaws
<br />to raze an existing non -conforming single family,
<br />residence and replace itwith a new single family
<br />residence on property located in an R-3 Zoning
<br />District, Map 119 Parcel 36, Mashpee, MA.
<br />79 Neshobe Road: Owner, KlmberiyA. Ridenour
<br />requests a Variance under §174-31(Land Space
<br />Requirements) of the Zoning Bylaws to allow for
<br />construction of a,24 ft. by 28 ft. detached garage
<br />on property located in an R-3 Zoning District,
<br />Map 125, Parcel 56, Mashpee, MA.
<br />21 Overlook Knoll Road: Owners, Donna Kelley
<br />and Stephen J.' Bonkowski request a Special
<br />Permit under §174-17.1 of the Zoning Bylaws
<br />to raze an existing non -conforming single family
<br />residential structure and replace it with a new
<br />single family, residential structure on property
<br />located in an R-3 Zoning District, and the Pop-
<br />ponesset Overlay District, Map 118 Parcel 35,
<br />Mashpee, MA.
<br />114 & 118 NlnlyretAvenue: Owners, Russell J.
<br />and Susan Hanley McDonald, request a Special
<br />Permit under §174-.17.1 of the Zoning, Bylaws
<br />to raze and replace: a two bedroom cottage
<br />located on, 118 Ninigret Avenue, and rebuild a
<br />new single family residential structure on prop-
<br />erties 114 and 118 Ninigret Avenue, located in
<br />an R-3 Zoning District, Map 65 Parcels 63 and
<br />64, Mashpee, MA.
<br />79 Echo Road: Petitioner, Mac Davis Flooring
<br />requests a Special Permit under §174-24 (C);
<br />§174-25 (G) (14), §174-25 (G) (6), (9); §174-45.6
<br />(D); §174-37 and §174-41 (M) of the Zoning
<br />Bylaws to allow for construction of a 9.920 sq. ft.
<br />metal building with contractor bays for its flooring
<br />business on property located in an 1-1 and Light
<br />Overlay Districts, Map19 Parcel 3-3. Mashpee,
<br />MA (Owner. of Record: Pamela M. Gangemi,
<br />Trustee of the 81 Echo Road Realty Trust).
<br />83 Red Brook Road: Owner, Jordan Keliinui
<br />requests a Special Permit under§174-17.1 ofthe
<br />Zoning Bylaws to raze a non -conforming single
<br />family residential structure and replace it with
<br />a new two bedroom structure; and a detached
<br />accessory dwelling unit (ADU) on property lo-
<br />cated In an R-3 Zoning District, Map 104 Partial
<br />4, Mashpee, MA.
<br />IF laps mify be viewed prior to the hearings in
<br />the ZBA office.
<br />Per Order of. Jonathan D. Furbush, Chairman
<br />Mashpee Zoning Board of Appeals
<br />3eptember 16,, 23, 2022
<br />19 n,
<br />MASHPEE ZONING BOARD OF APPEALS
<br />DECISION FOR A SPECIAL PERMIT
<br />Name: Owner, Jordan Keliinui
<br />Address: 83 Red Brook Road, .Mashpee, MA 02649
<br />Case: SP-2022-45
<br />William A. Blaisdell
<br />d" / "'" — 'I . . . ............. . . . . . . ....... ....
<br />�? a Pt �, "y
<br />IN FAVOR TO DENY
<br />r� ❑
<br />I_] ❑
<br />❑ ❑
<br />This Decision has been duly filed i',q 1 T ...o�aq with the Town Clerk
<br />of Mashpee. Any Appeals shall be made pursuant to Section 17 of the Massachusetts
<br />General Laws Chapter 40A within Twenty days after the date of said filing.
<br />This Decision is effective when a Certified Copy is filed at the Barnstable County
<br />Registry of Deeds. A Certified Copy may be obtained from the Town Clerk the next
<br />business dad, after the expiration of the 20-day Appeal period, which extends through
<br />Special Permits and Written Findings shall
<br />lapse three years after date of grant unless a shorter period of time is specified in the
<br />Decision. If the rights authorized by a Variance are not exercised within one year of
<br />date of grant of such Variance, such rights shall lapse unless: (1) substantial use or
<br />construction has commenced, or (2) a Petition for a six-month extension has been filed
<br />prior to the expiration date, or (3) the property that is the subject of the Variance has
<br />been conveyed in reliance on said Variance prior to the expiration date of such one year
<br />period.
<br />4
<br />
|