My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/07/1990 PLANNING BOARD Minutes
>
03/07/1990 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:00:55 PM
Creation date
1/24/2023 1:44:02 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
03/07/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Board had required the applicant's engineers supervise <br /> laying of sewer lines and Mr. Kirrane presented a document <br /> from Eagle Surveying stating they had supervised the <br /> installation. <br /> The Board determined that it had been agreed upon a total of <br /> 84 lots would be on septic systems. (Mr. Kirrane corrected <br /> his decision to read 84 from 85) . <br /> There is deed language requiring hook up. <br /> Mr. Kirrane added to the decision that lawns will be limited <br /> to 3 , 000 feet. He will prepare an amendment to restrictive <br /> covenant and will send copy of covenant to the Planning <br /> Dept. <br /> Mr . Kirrane explained to the Board that this project is <br /> having it difficulties , financially and they are looking at <br /> bringing investors into the project. Anyone interested in <br /> investing in it is concerned about the status of the permit. <br /> It is Mr. Kirrane 's opinion that they have undertaken <br /> significant construction within the two year period. The <br /> phasing schedule for condominiums , however, has not <br /> happened. At a later date they will revise that phasing <br /> schedule. <br /> He would like an indication from the Board that significant <br /> construction has been undertaken. <br /> Lee will draft a letter stating it is the Board's opinion <br /> that substantial construction has been undertaken and the <br /> Board does not ,consider permit lapsed because phasing <br /> schedule has not been meet. The Board will review that <br /> letter at their next meeting. <br /> Louise made a motion to sign the modification. Wayne <br /> seconded the motion. ' All other Board members were in <br /> favor. I <br /> APPROVAL NOT REQUIRED PLAN <br /> Applicant: Daniel Hostetter <br /> Location: Willowbend project <br /> Request: Submission of 1-lot ANR plan . <br /> Mr. Kirrane explained that the applicant has negotiated .74tlj <br /> the party which originally owned a sizable portion of this <br /> land to take over the ultimate construction of some of the <br /> condominiums . Therefore, they have an ANR plan which will <br /> put 15 units on a separate lot. ANR breaks one condominiums <br /> elements into 2 separate parts . <br /> Charlie stated that they should reference the covenant on <br /> the plan. <br /> Mr . Kirrane will return with plan that reference ' s t!-,--- <br /> covenant. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.