My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/19/2023 PLANNING BOARD Minutes
>
04/19/2023 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:36:55 PM
Creation date
6/9/2023 2:12:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
04/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16 Great Neck Road North <br />-Alashpee, Massachusetts 02649 <br />NEW BUSINESS <br />Lisciotti Development requests that the surety being held by the Town for completion of <br />the Sherwin Williams project be reduced to $0.00 after completing construction in <br />accordance with the approved plans. <br />Mr. Lehrer is holding $23,000 for outstanding items and they would like to reduce the amount <br />of the bond to zero. With a few minor requests needing attention, he is wondering if the Board <br />would approve the request with the condition that Lisciotti pays the final remaining invoice. Mr. <br />Lehrer would like a receipt of that final invoice as well. <br />Mr. Pesce commented that the entire project had a dozen items needing completion like <br />seeding and loaming that could only be done under certain weather conditions. Once the grass <br />grows everything will be fine. Another remaining item is the establishment of a detention basin, <br />as one grassy area didn't take and eroded. It was not loamed and seeded last fall so it eroded <br />over the winter. They were asked to remove sediment and add more stone, loam, and seed <br />which they completed. He would support approval to release funds subject to his final <br />inspection in a couple weeks when there is grass. He will submit the invoice and that cannot <br />be paid out of surety. Other than those couple items, everything looks great. <br />MOTION: <br />Mr. Balzarini made a motion to bring the surety being held for Lisciotti Development for <br />the Sherwin Williams project down to zero balance with the condition that everything <br />passes final inspection with the Consulting Engineer, final invoice is paid in full, and Mr. <br />Lehrer receives final invoice. Seconded by Ms. Faulkner. <br />Roll Call: <br />Mr. Balzarini: Yes, Ms. Faulkner: Yes, Mr. Fulone: Yes, Ms. Waygan: Yes <br />TOWN PLANNER REPORT <br />District Local Technical Assistance Funding Request <br />Mr. Lehrer submitted a request for technical assistance funding. This will be a reimbursement <br />after we have already paid. We have $50,000 and we will get reimbursed $25,000 from this <br />DLTA. This will cover the HPP updates and a good consultant that will be kicking off soon. <br />The Regional Housing Strategy scheduled four community events that are all being held at the <br />Mashpee Public Library. <br />Ms. Waygan would like to get the HPP Consultant on board for some of those meetings. A lot <br />of comments will be provided and that information could be useful for the HPP. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.