My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/03/2023 PLANNING BOARD Minutes
>
05/03/2023 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:37:16 PM
Creation date
6/9/2023 2:57:21 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
05/03/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16 Great Neck Road North <br />Nashpee, Nassachusetts 02649 <br />Mr. McNabb is saying it's unreasonable for new owners to come in and be responsible for this. <br />Ms. Waygan noted in order for that to be changed, the person who applied for that special <br />permit needs to amend it. <br />None of the Legacy Blue Castle residents thought the road would be left like this. There is a <br />big misunderstanding in what legacy owners said and what's on public record. He disagrees <br />with that perspective, and he thinks the road is very unsafe especially in the winter. <br />Mr. Balzarini said this just happened with his road of maybe three miles and it cost $35,000- <br />50,000. <br />Mr. Rosen stated $35,000 spread out over 20 years between 26 owners is reasonable. <br />Mr. Balzarini stated a drainage system will need to be installed because part of the road has <br />no draining. <br />Mr. Pesce thinks it's fantastic something is attempting to be done. You can't compel the other <br />16 people to join the HOA and pay. Several times he's driven the condition of the road and <br />since the last time he cannot see any evidence of maintenance or improvements. <br />Ms. Waygan hesitates to change the agreement. Mr. Morin is working on it and the Town <br />Engineer is on it. She asked if Mr. Morin was in agreement to meeting that target for May 17tn <br />Mr. Morin stated he shared with Mr. Lehrer the timeline of the schedule for paving. He had a <br />contract with the company initially any he could've gone to others, but he cannot control the <br />paving schedule. They are the ones who are contracted with him. <br />Mr. Pesce could see evidence of street sweeping and the catch basins were all fine for erosion <br />control. The sooner the loam and seed happens the sooner it will look better and be more <br />stable. <br />Mr. Balzarini stated the erosion control socks help. <br />Ms. Faulkner asked Mr. Morin when he first made contact with Lawrence- Lynch Corp and <br />asked for documentation proving said contact was made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.