My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-Annual Town Report
>
2019-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 5:02:58 PM
Creation date
8/28/2023 9:26:39 AM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Report of the <br />Department of Public Works <br />To the Honorable Board of Selectmen and the <br />Citizens of the Town of Mashpee: <br />In 2019, the Department of Public Works <br />performed its normal operations for maintaining the <br />town roads, buildings, and properties including <br />Heritage Park, South Cape Beach, the Transfer Station, <br />and Great Neck Woods Cemetery. <br />Below are highlights of several specific activities <br />during the past year. <br />Road Projects <br />The following roads in Briarwood were <br />reconstructed with drainage improvements — Cranberry <br />Avenue, Hilltop Avenue (partial), Valley Road, <br />Woodland Avenue, Pinecrest Avenue, and Wheeler <br />Road. The project was funded through the DPW <br />Operational Budget (FYI 9 and FY20) and the Capital <br />Improvement/Road Bond. <br />Design work continued for reconstruction and <br />improvement of Route 151. The project will ultimately <br />include upgrading of the traffic signals, extension of <br />the multi -use path along the entire corridor in Mashpee, <br />construction of a sidewalk from Job's Fishing Road to <br />Winslow Drive, improvement of signage and lighting, <br />and improvement/lane reconfigurations at various <br />intersections as well as reconstruction of the road itself. <br />Construction funding for the project will be through the <br />Cape Cod Transportation Improvement Program and is <br />scheduled for FFY20/21. Design is being funded <br />through Chapter 90. A 25% design public hearing was <br />held with MassDOT on March 21, 2019. The 75% <br />design plans will be submitted in Spring 2020. <br />Construction began for the improvements on <br />Cotuit Road from Route 130 to the Town Line at <br />Somerset Road. The project will include drainage <br />improvements, realignment of the intersection at Route <br />130, construction of a sidewalk on the east side of the <br />road, and resurfacing of the road. Work completed this <br />year includes the drainage improvements and <br />construction of the sidewalk through the binder paving. <br />Resurfacing of the road and final paving of the <br />sidewalk is scheduled for Spring 2020. Realignment <br />of the intersection at Route 130 is still pending; the <br />requirement to relocate a utility pole may delay this <br />work until Fall 2020. The work will be funded through <br />Chapter 90. <br />Replacement of the culvert for the Santuit River <br />at the Town Line on Sampson's Mill Road was <br />completed as well as stormwater improvements and <br />resurfacing of the road from Willowbend Drive to the <br />Town Line. The culvert provides passage for river <br />herring from Shoestring Bay to the fish ladder at <br />Santuit Pond. Santuit River is also habitat for sea -run <br />brook trout. Design for the project was funded in part <br />by a grant received from the MA Division of Ecological <br />Restoration. A $622,500 grant was received through <br />the USDA Natural Resources Conservation Service for <br />construction. The balance of construction costs was <br />shared by the Towns of Mashpee and Barnstable (the <br />culvert is jointly owned by the two towns). Mashpee's <br />share was funded through Chapter 90. <br />The Cape Cod Commission undertook a corridor <br />study of the Mashpee Rotary. A series of public <br />meetings were held over the year. A final report is <br />expected in early Spring 2020. Information on the <br />study is posted on the Town's website at <br />www.mashpeema.gov/public-works/studies. The final <br />report will include a review of the challenges with the <br />current rotary, the alternative designs considered to <br />improve and/or replace the rotary, and the <br />recommended design. The Town will be working with <br />MassDOT on implementation of the recommendation. <br />The Mashpee Wampanoag Tribe received a grant <br />for survey/design from the Federal Highway <br />Administration's Tribal Transportation Program Safety <br />Program for drainage, pedestrian, and road <br />improvements on Old Barnstable Road. The Town will <br />be working with the Tribe through 2020 on completion <br />of design of this project. <br />Special Projects <br />Construction for the new parking lot at Ockway <br />Bay Boat Ramp was completed in Spring 2019, in time <br />for use during the summer boating season. Additional <br />funding was needed to complete the project; the <br />funding was approved at the October Town Meeting. <br />Final paving and landscaping of the parking lot is <br />scheduled for Spring 2020. The project was funded by <br />the Community Preservation Act. <br />157 <br />
The URL can be used to link to this page
Your browser does not support the video tag.