My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-Annual Town Report
>
2019-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 5:02:58 PM
Creation date
8/28/2023 9:26:39 AM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Construction of a half -sized basketball court was <br />completed at Attaquin Park in time for the summer <br />beach season. Expansion of the existing play structure <br />and erection of a shade shelter is proposed for Spring <br />2020. This project was funded by the Community <br />Preservation Act. <br />In conjunction with the Historical Commission, <br />the Community Park Committee, and Mashpee <br />Veterans, plans for a memorial to recognize Mashpee <br />residents who have served on behalf of the United <br />States in wars/conflicts throughout history were <br />finalized. The memorial will be constructed in the <br />Community Park this upcoming year with a dedication <br />in October 2020. This project is funded by the <br />Community Preservation Act with a state grant. For <br />more information, see the Historical Commission's <br />annual report. <br />Building Projects <br />The Town continues to work with Cape Light <br />Compact (CLC), National Grid, and Green <br />Communities to implement energy efficiency projects <br />at Town buildings. See the report of the Planning & <br />Construction Committee for a list of projects <br />completed/proposed with these funds. <br />A Capital Improvement Bond was approved at the <br />May 2017 Annual Town Meeting. See the report of the <br />Planning & Construction Committee for a list of <br />projects completed/proposed with these funds. <br />Substantial completion for the Quashnet School <br />Window/Door/Roof project was achieved in December <br />2018 with final completion in April 2019. Funding for <br />the project had been approved at the May 2017 Annual <br />Town Meeting and a construction contract awarded in <br />December 2017. See the report of the Planning & <br />Construction Committee for an update on the project. <br />Projects completed over the year on Town <br />buildings and facilities (all except the schools) were: <br />replacement of the boiler at the Fire Station <br />Headquarters; renovation of the DPW office; <br />replacement of DPW office A/C unit; replacement of <br />heat pump in Police Chief's office; upgrade of energy <br />management system at Library; roof replacement at the <br />Archives. <br />Over the year, the following additional work was <br />completed in the three school buildings: at <br />Middle/High School — upgrades to the wastewater <br />treatment facility including replacement of the sand <br />filter; carpet replacement in classrooms; flooring <br />replacement in student bathrooms; replacement of gym <br />divider/curtain; security improvements in main entry <br />vestibule; at KC Coombs School — replacement of <br />exterior gym doors; flooring replacement in teacher's <br />lounge; at Quashnet School — flooring replacement in <br />the hallways; removal of abandoned boiler; <br />replacement of furnace gas regulator; replacement of <br />pilot assembly for kitchen heating unit; replacement of <br />kitchen grease trap. <br />Transfer Station <br />In 2019, the Town collected 3,517 tons at the <br />Transfer Station, a negligible change from 2018. <br />Due to market changes for recycling, in June <br />2019, the Town changed from single stream recycling <br />back to source separation of recyclables (glass, plastic, <br />mixed paper, newspaper, and cans). Despite the <br />change, recycling participation remained relatively the <br />same as the prior year. To the credit of users, there was <br />only a 1% decrease in the general recyclables (marked <br />with *) from 2018 to 2019. <br />Below is a list of some of the materials collected <br />at the Transfer Station with a comparison of the <br />quantities collected in 2018 versus 2019. <br />2018 <br />2019 <br />*Cardboard <br />159 tons <br />166 tons <br />*Single Stream <br />602 tons <br />277 tons <br />*Glass <br />- <br />98 tons <br />*Plastic <br />- <br />44 tons <br />*Mixed Paper <br />- <br />124 tons <br />*Newspaper <br />- <br />30 tons <br />*Cans <br />- <br />10 tons <br />Scrap Metal/Appliances <br />286 tons <br />288 tons <br />Rigid Plastic <br />24 tons <br />26 tons <br />Tires <br />544 tires <br />612 tires <br />Electronics/CRTs <br />39 tons <br />34 tons <br />Propane Tanks <br />575 tanks <br />638 tanks <br />Mattresses 1052 <br />mattresses <br />1340 mattresses <br />Residents are also able to compost food waste at <br />the Transfer Station. Kitchen scrap buckets can be <br />picked up at the DPW. Scraps that can be composted <br />include fruit and vegetable scraps, egg shells, coffee <br />grounds and filters, meat scraps, baked goods (see the <br />link on the Transfer Station page at <br />158 <br />
The URL can be used to link to this page
Your browser does not support the video tag.