My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-Annual Town Report
>
2022-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 5:02:50 PM
Creation date
8/28/2023 11:34:12 AM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Through the capital movement program the DNR Ongoing projects to reduce both external and <br /> received 3 brand new RBR water quality monitoring internal phosphorous loading within Santuit pond <br /> units. These units are top of the line and will help to include the following: <br /> supplement data needed for future policy makers.The <br /> 1 <br /> three units will be deployed in Mashpee Wakeby Pond, . Dredging Feasibility Study—U.S.Army Corps of <br /> Santuit Pond,and the Mashpee River. Engineers <br /> 2. DEP Approval of the Santuit Watershed Based <br /> This year we mourned the passing of SMAST's Plan—SNEP <br /> Chancellor Professor Brain Howes.Doctor Howes had 3. Aluminum Sulfate Treatment Feasibility Study <br /> a long and distinguished career in coastal and estuarine and Dosing Analysis—TRC Engineering <br /> ecology, helped to develop the Cape's 208 and Mass. <br /> Estuaries Reports, and painstakingly set Cape wide 4. Stormwater Design and Implementation (high <br /> nitrogen TMDLs for clean water. Brain has been priority sites)—Fuss &O'Neill ,MVP,SNEP <br /> intimately involved with all things water quality in 5. Bylaw Review—Fuss &O'Neill <br /> Mashpee for over twenty plus years.He will be greatly 6. Invasive Species Treatment — Partnered with <br /> missed. Mashpee Conservation <br /> Municipal Vulnerability Preparedness Grant: The DNR continues to work with The Southeastern <br /> Watershed-base Solutions to Increase Resilience to New England Partnership Program (SNEP), Fuss& <br /> Harmful Algal Blooms in Santuit Pond in a Warmer O'Neill,TRC Engineering,Army Corps of Engineers, <br /> and Wetter Climate. 604B / 319 Federal Clean Water and the Mashpee Wampanoag Tribe in reviewing and <br /> Act: implementing both internal and external measures <br /> within the Santuit Pond watershed to reduce the <br /> The Department of Natural Resources received occurrence of toxic cyanobacteria blooms and further <br /> the 2nd round of Municipal Vulnerability Preparedness phosphorous loading. <br /> (MVP) funding to implement one storm water <br /> green infrastructure retrofit design within the Santuit Harbor Management Planning—Seaport Economic <br /> Pond watershed, offer non-structural source control Council Award: <br /> measures to homeowners, and implement community Over the past year DNR staff have worked closely <br /> engagement and public involvement opportunities. with the Urban Harbors Institute, Office of Coastal <br /> This was the largest MVP award received in the state Zone Management,and Woods Hole Group to develop <br /> of Massachusetts for the FY23 funding round. a town-wide state approved Harbor Management Plan. <br /> The DNR submitted an additional grant proposal The newly formed Harbor Management Planning <br /> through the Federal Clean Water Act 604b/ 319 to Committee will continue to work next year with <br /> fund further stormwater infrastructure improvements members of the public and related stakeholders to <br /> within Mashpee: "The proposed project will advance develop a draft plan. Funds for this project were <br /> previously identified stormwater retrofit concepts for received from the Seaport Economic Council and <br /> the Mashpee Town Landing site to preliminary design. Mashpee residents in 2021. <br /> The stormwater retrofits will reduce stormwater inputs Boat Ramp Improvements: <br /> of sediment, nutrients, and other pollutants to Santuit Mashpee Wakeby: <br /> Pond, which contribute to well-documented harmful <br /> algal blooms and other water quality issues in Santuit The DNR and the Mass. Office of Fishing and <br /> Pond as well as water quality impairments in the Santuit Boating Access received funding for 75% design plans <br /> River and downstream coastal waters.The preliminary for the improvement of the Mashpee Wakeby Boat <br /> designs will position the Town of Mashpee to pursue Ramp.In 2023 the DNR will work closely with Horsley <br /> Section 319 Nonpoint Source Program funding or other Witten Group to draft plans to include stormwater <br /> sources of funding for final design, permitting, and design measures, additional ramp space, and erosion <br /> implementation of the proposed retrofits.The proposed controls. <br /> project is part of an ongoing multi-faceted approach <br /> that the Town and project partners are undertaking to Ockway Bay Landing: <br /> address both internal and external sources of excess The Ockway Bay ramp improvements are finally <br /> nutrients to Santuit Pond." complete. The ramp now has an adequate scour pad <br /> to prevent power loading and further damage created <br /> by ice and or wave action.The DNR has also installed <br /> 149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.