My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-Annual Town Report
>
2022-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 5:02:50 PM
Creation date
8/28/2023 11:34:12 AM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
two new floats on location to house approximately 2 more so on operational concerns come the high season, <br /> million quahogs for grow out in 2023. rather than dealing with late mooring payments and <br /> Mashpee Neck Landing: <br /> nonpayment of moorings. The Division also removed <br /> over 15 derelict moorings and other objects throughout <br /> The DNR along with Mashpee Department of Town waters in the late summer months. <br /> Public Works and the Waterways Commission received In 2022 the Mashpee Pump-Out program <br /> draft engineered plans for much needed improvements removed over 2,250 gallons of brown and black water <br /> to the Mashpee Neck / Pirates Cove / Ed Baker boat from vessels over the course of 450 hours.This service <br /> ramp. If community preservation funds are received allows boaters throughout Town waterways to safely <br /> next year, the ramp will undergo its first rejuvenation dispose of their grey water and supports the DNR's <br /> in over 30 plus years. These improvements will help Nitrogen management program with promoting clean <br /> to ensure the longevity of the ramp and help to reduce <br /> water. <br /> boat ramp congestion in the summer months. <br /> 2022 saw an increase in General Calls for service <br /> Department's New Building: and after hours call outs to the Division. General Calls <br /> The DNR has partially moved in to our new for service saw an increase from 26 last year to 37 this <br /> building located at 31 Mercantile Way in units 6 and 7. year and after hours call outs (including: SAR, noise <br /> The new building will allow staff the ability to work on complaints,and law enforcement missions) went from <br /> mission critical equipment year round. Special thanks 5 last year to 18 this year. The Harbormaster Division <br /> Catherine Laurent and all Department of Public Works also responded to and investigated multiple small oil <br /> staff who have put in the hard work to construct our Spills,boating accidents,and waterways investigations <br /> new work spaces. throughout the year. The Division logged over 1,600 <br /> Harbormaster Division: hours of patrol on all bodies of water throughout Town <br /> This year the Mashpee Harbormaster Division and remained proactive with vessel stops and vessel <br /> took delivery of a new 25' MUNSON dual purpose inspections all year long. <br /> patrol and work boat. The vessel was delivered in The Harbormaster Division will remain dedicated <br /> August of 2022 and the Division immediately began to the residents,visitors,and boating community in the <br /> outfitting and rigging the vessel to departmental year 2023 and the tools that the Town and residents <br /> standards. The vessel is outfitted with the equipment have provided us will be used to the best of our abilities. <br /> necessary for the Division to complete its Aids to <br /> Navigation work, Search and Rescue, and maritime Shellfish Division: <br /> law enforcement and patrols. The vessel will primarily This past year has been a transitional year for the <br /> be used on all salt bodies of water throughout Town Shellfish department due to the Shellfish Constable <br /> and will be a shared asset throughout the DNR and having left to take a new position on Martha's Vineyard <br /> other town and outside agencies. The vessel will in mid-August. At which time,The Natural Resource <br /> prove to be an asset to both the Harbormaster Division Officer, Chris Avis stepped in to perform many of the <br /> and the Town of Mashpee. The Division could not be duties of said constable. <br /> more thankful for the support of the residences,Select This year we began to grow 2.5 million oysters <br /> Board, and Town Administration for the support on in Great River which will be seeded in the family area <br /> purchasing this new vessel. near the Great River boat ramp in November of 2023. <br /> In the year 2022, 552 mooring permits were Thatch Island and Mashpee River continue to grow <br /> renewed, 7 new mooring permits were issued, and 65 Oysters for the Mashpee Neck Landing fishery.Oyster <br /> dinghy rack permits were renewed and maintained. seed distribution in Popponesset Bay — 1,000,000 <br /> This year the Harbormaster Division also held a lottery animals are currently growing on Thatch Island for the <br /> for the new and improved dinghy racks at the Seconsett 2024 recreational harvest. <br /> Island causeway. The new racks allowed mooring This year saw higher water temps which lasted <br /> holders in Waquoit Bay to safely and efficiently store well into late fall. The result was Mashpee Neck <br /> their dinghies on town property while also maintaining Landing not opening till December due in fact to <br /> the existing landscape and sea wall. In late December water quality issues determined by the Department <br /> of this year, the Board of Selectmen approved a new of Marine Fisheries. The Oyster fishery moved from <br /> addition to the current regulations. The addition of Mashpee Neck Landing to Ockway Bay for the Month <br /> these new regulations allows the Harbormaster to focus <br /> 150 <br />
The URL can be used to link to this page
Your browser does not support the video tag.