My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-Annual Town Report
>
2022-Annual Town Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 5:02:50 PM
Creation date
8/28/2023 11:34:12 AM
Metadata
Fields
Template:
Annual_Town_Report
DocType
Annual Town Report
Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
energy systems). The Planning Board may reduce the 6. Documentation of actual or prospective access <br /> minimum setback distance as appropriate based on and control of the project site sufficient to allow for <br /> site-specific considerations. construction and operation of the proposed solar energy <br /> system. <br /> 5. Ground-mounted solar energy systems shall be <br /> set back a distance of at least 50 feet from abutting 7. Proposed hours of operation and construction <br /> conservation land and any property not included in the activity. <br /> Ground-mounted solar array application. The Planning <br /> Board may reduce the minimum setback distance as 8. Blueprints or drawings of the solar energy system <br /> appropriate based on site specific considerations. signed by a Massachusetts' licensed Registered <br /> Professional Engineer showing the proposed layout <br /> 6. Fixed tilt Ground-mounted solar energy systems of the system and any potential shading from nearby <br /> shall have a maximum height of 15 feet above grade. structures. <br /> In the case of single or dual axis tracking Ground- <br /> mounted solar energy systems,the Planning Board may 9. Utility Notification: Evidence that the utility <br /> increase the maximum height as appropriate based on company that operates the electrical and where a <br /> site-specific considerations. grid-intertie solar energy system is to be located has <br /> been informed of the system owner or operator's <br /> 7. inverters,energy storage systems,and transmission intent to install an interconnected facility and <br /> system substations shall be setback a distance of atleast acknowledges receipt of such notification, and a <br /> 200 feet from any residence. The Planning Board may copy of an Interconnection Application filed with the <br /> reduce the minimum setback distance as appropriate utility including a one or three line electrical diagram <br /> based on site-specific conditions. detailing the solar electric installation, associated <br /> components, and electrical interconnection methods, <br /> E. Special Permits Rules and Application with all Massachusetts Electrical Code (527 CMR§ <br /> Requirements 12.00) compliant disconnects and overcurrent devices. <br /> Off-grid solar energy systems shall be exempt from <br /> A Solar Energy System Special Permit shall not be this requirement. <br /> granted unless each of the following requirements, <br /> in addition to the requirements in §174-24 C Special 10. Documentation of the major system components to <br /> Permit use,are satisfied: be used, including the electric generating components, <br /> battery or other electric storage systems, transmission <br /> 1. A properly completed and executed application systems,mounting system,inverter,etc. <br /> form and application fee. <br /> H. Preliminary Operation and Maintenance Plan for <br /> 2. Any requested waivers. To this end,as part of its the solar energy system,which shall include measures <br /> Special Permit decision, the Planning Board may, at for maintaining safe access to the installation, storm <br /> its sole discretion, establish a lot coverage maximum water management, vegetation controls, and general <br /> that exceeds 20% in consideration of site specific procedures for operational maintenance of the <br /> conditions. installation. <br /> 3. Name, address, phone number and signature of 12. Abandonment and Decommissioning Plan: <br /> the project proponent, as well as all co-proponents or Any ground-mounted solar energy system which <br /> property owners, if any. has reached the end of its useful life or has been <br /> abandoned (i.e., when it fails to operate for more than <br /> 4. Names,contact information and signatures of any one year without the written consent of the Planning <br /> agents representing the project proponent. Board) shall be removed. The owner or operator shall <br /> physically remove the installation within 150 days of <br /> 5. Name, address and contact information for abandonment or the proposed date of decommissioning. <br /> proposed system installer. The owner or operator shall notify the Planning Board <br /> by certified mail of the proposed date of discontinued <br /> operations and plans for removal. The Abandonment <br /> 77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.