Laserfiche WebLink
and Decommissioning Plan shall include a detailed 2. All required setbacks shall be left in their <br /> description of how all of the following will be undisturbed natural vegetated condition for the duration <br /> addressed: of the solar energy system's installation. In situations <br /> where the naturally vegetated condition within required <br /> (a) Physical removal of all structures; setback is not wooded and does not provide adequate <br /> equipment,building,security barriers and transmission screening of the solar array, the Planning Board may <br /> lines from the site,including any materials used to limit require additional intervention including, but not <br /> vegetation. limited to: <br /> (b) Disposal of all solid and hazardous waste in (a) A landscaping plan showing sufficient trees <br /> accordance with local,state and federal waste disposal and understory vegetation,of a type common in natural <br /> regulations. areas of Mashpee,to replicate a naturally wooded area <br /> and to constitute a visual barrier between the proposed <br /> (c) Stabilization or re-vegetation of the site as array and neighboring properties and roadways. <br /> necessary to minimize erosion. The Planning Board (b) Berms along property lines and roadways <br /> may allow landscaping or below-grade foundations left with suitable plantings to provide adequate screening <br /> in situ in order to minimize erosion and disturbance of to neighboring properties and roadways. <br /> the site. <br /> 3. Lighting: Lighting of ground-mounted solar <br /> (d) Description of financial surety for energy systems shall be limited to that required for <br /> decommissioning: Proponents of ground-mounted safety and operational purposes,and shall be reasonably <br /> solar energy systems shall provide a form of surety, shielded from abutting properties. Lighting shall be <br /> either through escrow account, bond or other form of directed downward and shall incorporate full cut-off <br /> surety approved by the Planning Board to cover the fixtures to reduce light pollution. <br /> cost of removal in the event the Town must remove the <br /> installation and remediate the landscape,in an amount 4. Signage: Signs on ground-mounted solar energy <br /> and form determined to be commercially reasonable by systems shall comply with all applicable regulations <br /> the Planning Board, but in no event to exceed more of this by-law and/or any Town sign by-law. A sign <br /> than 125 percent of the cost of removal and compliance shall be required to identify the owner, operator and <br /> with the additional requirements set forth herein, as interconnected utility and provide a 24-hour emergency <br /> determined by the project proponent and the Town. contact phone number. Ground-mounted solar energy <br /> Such surety will not be required for municipal or state- systems shall not be used for displaying any advertising <br /> owned facilities. The project proponent shall submit Signage. <br /> a fully inclusive estimate of the costs associated with <br /> removal,prepared by a qualified engineer. The amount 5. Utility Connections: Within setback distances <br /> shall include a mechanism for calculating increased and except where soil conditions, location, property <br /> removal costs due to inflation. shape, and topography of the site or requirements of <br /> the utility provider prevent it, all utility connections <br /> (e) It shall be a condition of any special permit from grid-intertie solar energy systems shall be placed <br /> that all legal documents required to enable the Town underground. Electrical transformers for utility <br /> to exercise its rights and responsibilities under the interconnections may be above ground if required by <br /> plan to decommission the site, enter the property and the utility provider. <br /> physically remove the installation shall be provided <br /> prior to the issuance of a building permit. 6. Vegetation Management: All land associated <br /> with the ground-mounted solar energy system shall be <br /> F. Required Performance Standards: Small, covered and grown in natural vegetation. The height <br /> Medium and Large Scale Solar Energy Systems of vegetation must be managed by regular mowing <br /> 1. Visual Impact Mitigation: The site plan for or grazing so as to minimize the amount and height <br /> a ground-mounted solar energy system shall be of combustible material available in case of fire. <br /> designated to screen the array to the maximum extent Herbicides, pesticides, or chemical fertilizers shall <br /> practicable year round from adjacent properties in not be used to manage vegetation. To the greatest <br /> residential use and from all roadways. extent practicable, a diversity of plant species shall be <br /> used, with preference give to species that are native <br /> 78 <br />