My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/09/2023 ZONING BOARD OF APPEALS Minutes (2)
>
08/09/2023 ZONING BOARD OF APPEALS Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2024 5:12:42 PM
Creation date
4/12/2024 4:25:24 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
08/09/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
196
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
community and would be in harmony with the general purpose and intent"of the bylaws.A copy <br /> of the 1980 Modification is attached here as Exhibit D. <br /> 20. The 1980 Modification extended the Special Permit subject to ten changes and <br /> conditions. Condition No. 3 of the 1980 Modification stated as follows: "The project shall be <br /> phased at least over a five-year period,but not exceed more than ten years. Not more than one <br /> hundred four(104)condominiums,but no less than fifty-two (5ZI Condominiums in one year. <br /> Not more than forty-six (46) single-family houses in one year."(emphasis in original). <br /> 21, Under condition No. 10, the Building Commissioner was to keep track of the <br /> schedule referenced in paragraph 3: "If the requirement cannot be met,the permit can be <br /> considered in default." <br /> .22. Thereafter,the 1980 Modification was further modified. For example,on June 3, <br /> 1981,the Board voted to waive the minimum unit development requirements for the years 1980 <br /> and 1981 (the"1981 Modification").A true and correct copy of the 1981 Modification is <br /> attached as Exhibit E. <br /> 23. By 1982,the first phase of construction of residential units had begun. By 1983 <br /> the back nine holes were completed, and by 1984 the entire 18-hole golf course was open for <br /> play. Construction for the golf course's clubhouse began in mid-1985 and the clubhouse was <br /> opened in 1986. <br /> 24. By deed dated November 27, 1985, and recorded in the Barnstable Registry of <br /> Deeds,Book 4826,Page 068,the Trust acquired the Property, <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.