Laserfiche WebLink
apof MAS�Fe <br />INC. IBIN <br />n <br />�AOTamnw M�� <br />Board <br />16 Great Neck Road <br />North <br />Mashpee, Massachusetts 02649 <br />Poppy would love to set up a workshop session and talk about the Raze and Replace Bylaw. <br />They were here in January when the draft at the time was getting to be too much. They had 5 <br />community meetings or sessions that had up to 130 participants. There are other issues that <br />are concerning, such as the rising of the sea level. They want to raise awareness in their <br />community. Items range from sewering, to the rising sea level, the Raze and Replace, and new <br />construction costing $400/ s.f. <br />Ms. Waygan stated they can conduct a site visit where they don't talk about anything. Her <br />concern is being able to convene as a quorum in a public area that is fully accessible. They <br />can hold the first session at Town Hall then schedule a site visit. The bylaw was originally a set <br />of regulations for Poppy and then a set of regulations for town wide. If they are going to do <br />something town wide, they should reinvite the people who came that lived around the ponds. <br />This was affecting them as well. Our area is so unique with two overlay districts. <br />Mr. Lehrer reiterated the need for a public meeting with a posted agenda where anyone can <br />attend. <br />Ms. Waygan is fond of the workshop idea where everyone is sitting around a table. <br />Mr. Lehrer stated there is only urgency if they plan on submitting a Warrant Article in July, if <br />not, then there is ample time. <br />Ms. Waygan thinks they should meet after Memorial Day sometime in June, when more <br />seasonal community members are here, these seasonal homeowners in particular are really <br />engaged. <br />Mr. Lehrer offered the third week of June, the 17t" — 21st. Popponesset's summer meeting is <br />June 29t" so they would love to report back to their community. The June 19t" meeting is a <br />holiday, therefore not an option. Thursday, June 20t" was suggested. <br />Review and approval of Consulting Engineers Invoice <br />MOTION: <br />Mr. Richardson made a motion to approve Invoice 2024-2190 for engineering <br />professional services and review from March 14 - May 1, 2024 at 474 Main St. and <br />31 Ashumet Road, in the amount of $4,102.96. Seconded by Mr. Balzarini. All in <br />favor. Ms. Waygan abstained. <br />12 <br />