Laserfiche WebLink
I <br />Select Board <br />Minutes <br />January 6, 20,25 <br />APPOINTMENTS & HEARINGS <br />Affordable liousin Committe X.-g! o Le T—ina -At-La. Ferni Fnds JUne 30 )Q25: <br />Additional C011111IL1,11iCation was received (rorri Noelle Pina resigrfing from the Aflordable Housing <br />Committee dated January 2, 2025. <br />Motion made by Selectman Wyman -Colombo to accept the resignation of Noelle Pina from the <br />Affordable Housing Committee as as Member At Large with as term to expire June 30, 2025 with as <br />letter of regret. <br />Motion seconded by Selectman 01-fara. <br />VOTE: 5-0. Unanimous. <br />ii—oll call vote: <br />Selectman Sherman, yes Selectman Weeden, yes <br />Selectman Cotton, yes Selectman 0'14ara, yes <br />Selectman Wyman -Colombo, yes <br />Opposed, none <br />Discussion of Possible Comm <br />q!Lj 1y %rv,,,1!ion m Comittee 1!E6ec, Ve�tqj-.qps WaMonu r menP t hase 11 <br />Llre,w <br />Richard Commission; <br />Historical Conimission representative Richard DeSorgher presented the Veterans War Monument Phase If <br />project to the Select Board for approval. The project is before the Community Preservation Committee Im- <br />possible funding at the May 2025 Special Town Meeting. <br />The goal is to complete the project, initially approved in 2018 with Phase I completed in 2023. <br />flie Veterans War M011LIMent PhaSC 11 project would include the wars frorn, Operation Desert Shield to tile <br />War in Afghanistan which includes; tl'ie Persian Gulf War, Operation Enduring Freedom, Operation <br />Freedom's, Sentinel, Operation Iraqi Freedom, and Operation NeNv Dawn. <br />'Fhe Historical Commission has made as pledge to honor, recognize, and pay tribute to all veterans firorn <br />Mashpee, and there has been public interest in lionoring these wars. It is estiniated the monunient would <br />contain 350 veteran nan-ies, with spacing to add additional names to ensure all veterans would be listed. <br />The granite wall nionunient is proposed to resemble a, wave with a pile xiglass dry stone water Feature <br />enhanced by landscape, native plantings, lighting, pavers, benches, and walkways. The added landscape <br />with a proposed grass berm will reduce excess noise and bring as sense of calm and quiet to lionor the <br />veterans. With the berm, the project is anticipated to cost $439,740. Approximately 1 ,00t O woUld be <br />covered by the building and grounds budget ofthe DPW Isar this project. With Town,N/leeting approval, <br />CPC funds would provide the remainder ofrequired ffinds an estiniated 425,645, <br />117SUpap orted, construction would begin immediately with completion by early surnmer 2026, and a <br />dedicationthereafter, Once completed, the nionument, is envisioned as, a center piece of the (' 'orrin <br />ai­kiunity <br />P, The Director of Public Works is also noted to be assisting in this I.,)roject, working with the architect, <br />and overseeing kviorkto be accomplished by the DPW to defer costs. <br />