Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MAY 25, 2016 <br /> MINUTES <br /> Chairman Furbush read the Inspection Department comments into the record; "The area is <br /> zoned R3 and is within the Pre-contact Archaeology Sensitivity area--listed as "Moderate". <br /> The applicant is seeking a Special Permit under §174-251 (9) regarding the construction of a <br /> dock, pier, ramp and float extending more than 70 feet of coastal beach, coastal bank, salt <br /> marsh or bordering vegetated wetlands." <br /> Mr. Bonvie made a motion to issue a special permit for the application. He referenced the <br /> following conditions;The Board has determined that the applicant meets all the conditions <br /> of a Special Permit under Mass General Law 40A Section 9. A Plot Plan: Revised Nov. 9, <br /> 2012, Revised Nov. 3, 2012, Float Stops Note Revised To Maintain 2' Clearance Per <br /> Notification By Mr. York,Nov. 3, 2012, Revised Nov. 1, 2012 Decrease Total Length By <br /> 12' Float Stops Note, Revised Oct. 17, 2012, Proposed Pier, Ramp & Float, Located In <br /> Mashpee,Mass. Prepared For Kathleen Impey, Date: Oct. 12,2012,File: 167ma, Scale: 1' <br /> =20' Captrow90, Cape&Islands Engineering, 800 Falmouth Road, Suite 301 C,Mashpee, <br /> Mass 02649 508-477-7272, Signed By: David Sanicki 28085 Professional Engineer. Also <br /> referencing the Inspection Department and Conservation comments. Mr. Goldstein, <br /> seconded. Mr. Furbush, yes,Mr. Blaisdell,yes, Mr. Bonvie, yes, and Mr. Pittsley, yes. All <br /> were in favor to issue a special permit for the dock,pier,ramp and float. <br /> 154 Wheeler Road: Owner,Denise A. Dorado requests a Variance under §174-31 to vary <br /> the side yard setbacks and lot size requirements to allow for construction of a deck and <br /> stair addition on property located in an R-5 Zoning District, (Map 49 Parcel 7), Mashpee, <br /> MA. <br /> Mr.Matt Costa with Cape&Islands Engineering represented the application.The property <br /> is located on 154 Wheeler Road and boarders Ashumet Pond. The deck structure will run <br /> the length on the back of the dwelling. The lot was created in 1947, and at that time was <br /> approximately 54,000 sq. ft. lot and was revised in 1957 down to a 26,000 sq. ft. lot. In <br /> 1988 a road taking was done, and reduced a portion of the property reducing it further by <br /> approximately 1,500 square feet. The total area now is about 26,387 sq, ft. in an R-5 zone. <br /> The dimension on the north side of the existing structure and garage is about 15.6 ft. at the <br /> closest point to the existing structures. The relief would be 16.5 ft, so the deck will not be <br /> any closer than what currently exists. The existing garage is about 12.2 ft. off the property <br /> line which is even closer. He said they received approval from Conservation, and are <br /> required to put a mitigation plan together along the property line. <br /> Mr. Blaisdell wanted to confirm the requested relief to be 8.5 ft. from the property line. <br /> Mr. Goldstein noticed that the lot coverage on the plan showed the same 6.7% for existing <br /> and proposed. Mr. Costa said the existing lot coverage is 6.7%, and the proposed is under <br /> 10%. Mr. Costa will provide a revised plan showing the corrected lot coverages and <br /> revision date which Chairman Furbush will sign. <br /> 2 <br />