MASHPEE ZONING BOARD OF APPEALS
<br /> MEETING MINUTES
<br /> SEPTEMBER 14, 2016
<br /> Chairman Furbush read the Inspection Department and Conservation comments into the
<br /> record. Conservation approved the project at their August 11, 2016 hearing.
<br /> Attorney Kirrane asked if the garage could be increased by 1 ft. Mr. Blaisdell said that
<br /> would require a modification filing to the approved Written Finding.
<br /> Mr. Bonvie made a motion to approve the Written Finding. The Board has determined that
<br /> the applicant meets all the conditions of a Written Finding under Mass General Law 40A
<br /> Section 6. This is also conditioned upon the following;
<br /> Plot Plan—Existing House Prepared for Jason Stone, 156 Waterway,Mashpee,MA. BSS
<br /> Design Engineering & Surveying, 164 Katharine Lee Bates Rd., Falmouth, MA. Scale: I
<br /> = 10',Date:July 8,2016,(Received Sept. 8,2016),Drawn: EJP,TJB,Job Number: 15134,
<br /> Revisions. Sheet 1 of 2, Title: Existing Conditions, Drawing Number: B23-70.
<br /> Plot Plan - Proposed House and Subsurface Sewage Disposal System: Prepared for
<br /> Jason Stone, 156 Waterway, Mashpee, MA. BSS Design Engineering & Surveying, 164
<br /> Katharine Lee Bates Rd.,Falmouth,MA, Scale: 1"= 10',Date: July 14,2016, Drawn EJP,
<br /> MRT, Checked: JER,Job Number: 15134, Revisions: Extended Deck, July 22, 2016 TJB.
<br /> (Received: August 19, 201M), Sheet 2 of 2, Title: Site Plan and SSDS Profile, Drawing
<br /> Number: B23-70. Revisions: Extended Deck. July 22,2016, TJB, Corrected Upland Area,
<br /> Changed Septic System Sept. 14, 2016, TJB.
<br /> Conditioned upon the Inspection Department comments, Board of Health comments, and
<br /> Conservation comments.
<br /> Mr. DeBarros seconded. All were in favor of the raze and replace project.
<br /> Mr. Bonvie made a motion to accept the withdrawal of the variance request. Mr. Gould
<br /> seconded. All were in favor of the variance withdrawal.
<br /> 65 Seconsett Point Road: Owner, Katherine F. Lingamfelter requests to re-establish a
<br /> Written Finding that was previously granted on February 5, 2014 (Finding-2013-61) to
<br /> allow for construction of two new porches on property located in an R-3 Zoning District,
<br /> Map 124 Parcel 14-0-R, Mashpee, MA.
<br /> Attorney, Brian Wall represented the homeowner to re-establish the Written Finding that
<br /> was previously granted but lapsed because it went beyond two years. He provided a revised
<br /> plan that shows a change in the shape of the dwelling by removing one of the porches. Mr.
<br /> Wall said that it is approximately 2/3rds less than the original design.
<br /> The Board wanted clarification on the revised structure of the boat house. Attorney Wall
<br /> said that he had a discussion with Mike Mendoza regarding the windows of the boat house,
<br /> and was brought to the Board back in January for clarification. That conversation is not
<br /> related to this present hearing.
<br /> 7
<br />
|