Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> SEPTEMBER 14, 2016 <br /> Chairman Furbush had questioned the current status of the construction within the <br /> wetlands.Attorney Wall said that an extension was filed for the wetlands permit that is still <br /> valid, and is valid for three years. <br /> Mr. Mendoza wanted to know why a Variance was not filed for the 50 ft. buffer to the <br /> wetlands. <br /> Attorney Wall said that the existing structure is within the 50 ft. buffer of the wetlands and <br /> that's the reason for the Written Finding under Section 174-17 to alter or change a pre- <br /> existing, non-conforming structure. The non-conformity is not getting any greater because <br /> there is nothing being built closer to the wetlands, and the porch is being built in the back <br /> of the existing structure. <br /> The Board had a discussion about the proposed deck being built below the flood plain <br /> elevation. Attorney Wall said it's a pre-existing, non-conforming structure and the <br /> proposed screened porch is well below the 50% of the appraised value. <br /> Mr. Bonvie made a motion to approve the Written Finding as previously granted. The <br /> application was changed by reducing the amount of porches. <br /> The Board has determined that the applicant meets all the conditions of a Written Finding <br /> under Mass General Law 40A Section 6. <br /> Certified Plot Plan: Prepared by Cape & Islands Engineering entitled; House No. 65 <br /> Seconsett Pt Rd., Proposed Site Plan located in Mashpee, Mass. prepared for Katharine & <br /> Brown Lingamfelter, Sheet No: 1 of 1, Date: 4/28/16, DWG File: Seconsettpoint_65, <br /> Scale: as noted, Approved by: MC, Checked by: MC, Drawn by: WD. Assessors <br /> Information: Parcel ID: 124-14-0. Signed by Matthew Costa NO. 52282. <br /> The original Plot Plan that was approved in 2013 is as follows: Plot Plan Prepared by Cape <br /> &Islands Engineering entitled;House No. 65 Seconsett Pt Rd.,Proposed Site Plan located <br /> in Mashpee,Mass. prepared for Katharine&Brown Lingamfelter, dated January 17, 2012, <br /> Scale: 1' = 20' file: 143MA, Rev. June 8, 2612, Rev. September 20, 2013, Rev. October <br /> 20, 2013, remove boat house, title requirements with no additional flow, cottage additions <br /> only. Upland Lot Area = 33,500 SF, Existing Lot Coverage = 4.6%, and Proposed Lot <br /> Coverage=7.2%,Flood Zone VI 8 EL 14, This Project is Not located in an area of critical <br /> environmental concern. <br /> Mr. Blaisdell seconded. All were in favor of approving the revisions to the existing <br /> dwelling with the reinstated Written Finding. <br /> 8 <br />