My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/01/2016 ZONING BOARD OF APPEALS Minutes
>
07/01/2016 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2025 5:05:06 PM
Creation date
2/13/2025 1:28:41 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
07/01/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> SEPTEMBER 14, 2016 <br /> 13 Compass Circle: Owners,Paul S. and Margaret K. Hovsepian request a Variance from <br /> the side-yard setback, and lot size requirements under §174-31 and §174-3 3 of the Zoning <br /> Bylaws to raze and replace a single-family home and garage on property located in an R-3 <br /> Zoning District, Map 105 Parcel 257-0-R, Mashpee, MA. <br /> Chairman Furbush and Board Member, Scott Goldstein stepped down from this hearing. <br /> Mr. Blaisdell is acting Chairman along with the remaining Board members. <br /> Attorney Brian Wall represented the homeowners for this project. Also present was Tom <br /> Bunker from BSS Design, Harry Capone, Architect and the homeowners. Mr. Wall stated <br /> that the homeowners would like to either modify the two existing variances, or the <br /> alternative, to have new variances issued because the existing structures that exist today <br /> were approved under the existing variances previously granted. <br /> The lot was created back in 1963. It's non-conforming because it has 24,000 sq. ft. where <br /> 40,000 is required, and it has 75 ft. of frontage and 150 is required. The boundaries of the <br /> lot were changed back in 1988 by a land swap.He believes the land swap was done because <br /> an existing structure was built on the neighboring lot and was built right on the property <br /> line. <br /> Mr. Bonvie asked if this lot was created by a Form A or a deed, and was the square footage <br /> reduced. <br /> Mr. Wall said it was both a Form. A and a deed; the Form A was to change the lot lines. <br /> The frontage remains the same and the lot area remained the same. It was a square footage <br /> swap one for one basically to provide the abutting property some land to create a setback <br /> and give equal land for both lots. The lot is non-conforming as to area and frontage. The <br /> changes to the lot lines do not change area or frontage. <br /> The existing house was built in 1969, and complies with front,rear and side yard setbacks <br /> as well as lot coverage requirements. The house is closer to the wetland than 50 ft., and as <br /> a result the house does not comply with the 50 ft. setback. This was authorized back in <br /> 1987, and is included in the proposal. <br /> The existing garage was built in 1995, it similarly complies with front and rear setbacks, <br /> but is only 7.4 ft. from the side lot line with does not comply with the 15 ft. side yard <br /> setback required by Section 174-31, but similarly was authorized by a Variance issued in <br /> 1995, and that was also included in the proposal. <br /> They would like to raze the existing home and garage,and replace with same size structures <br /> in the same footprint. The existing setback is 39 ft. the proposed is 42 ft., but there is a <br /> cantilevered deck.The new structure will be elevated above the flood plain and will comply <br /> with flood hazard requirements. The existing elevation is 10.4 ft. and the new elevation <br /> will be 12.5 ft. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.