Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MARCH 23, 2016 <br /> MINUTES <br /> 120 Summersea Road: Owners, James 1. and Ellen B. Goodman request a Special Permit <br /> under §174-25.I (9) of the Zoning Bylaws to allow for construction of a dock, pier, ramp <br /> and float extending more than 70 feet of coastal beach, coastal bank, salt marsh or <br /> bordering vegetated wetlands, on property located in an R3 Zoning District, (Map 105 <br /> Parcel 52), Mashpee, MA. <br /> Mr. Kieran Healy, Land Surveyor with B S C Group represented the homeowners for their <br /> dock project. The Zoning Board approved the house project earlier this year, and he was <br /> told to file separately for the new dock. The plot plan he provided depicts the existing fixed <br /> pier and the proposed ramp and float that was approved by the Conservation Commission. <br /> The embankment leading to the dock is very steep and is only accessible by a rope. The <br /> proposed new stairs will be 4 x 4 post construction and set into the ground on the upland <br /> side and pilings set into the ground about 5 ft. below the mean high water with lag bolts <br /> secured to the joists. The old shed will be replaced with a new shed in the same location, <br /> and will be elevated about a foot and a half and bolted into the pilings. <br /> Chairman Furbush read the Conservation comments into the record; "This project was <br /> approved by the Commission. No issues". The Inspection Department comments; "The <br /> area is zoned R3 and is in the Pre-contact Archaeology Sensitivity area--listed as part in <br /> both the"High Sensitivity"and"Moderate Sensitivity". The applicant is seeking a Special <br /> Permit under §174-25 I (9) regarding the construction of a dock, pier, ramp and float <br /> extending more than 70 feet of coastal beach, coastal bank, salt marsh or bordering <br /> vegetated wetlands." The Board of Health comments; "no comment necessary". <br /> Mr. Goldstein made a motion to approve the dock project; as noted in the Plan of Land, <br /> 120 Summersea Road,Mashpee,MA,Proposed Conditions,and February 17,2016. Issued <br /> for Permitting Not for Construction,Prepared for: James&Ellen Goodman,46 White Oak <br /> Lane, Sudbury, MA 01776. BSC Group, 349 Rte. 28, Unit D, W. Yarmouth, MA 02673, <br /> Scale: 1"= 10', File: 9959-SP-3.DWG, DWG No: 6317-06, Job No.: 4-9959.00 Sheet I of <br /> 1. Mr. DeBarros seconded, yes, Mr. Furbush, yes, Mr. Blaisdell, yes, and Mr. Gould, yes. <br /> All were in favor of the dock project. <br /> OTHER BUSINESS <br /> 184 Monomoscoy Road: Received withdrawal letter dated March 17, 2016 from BSS <br /> Design regarding Special Pen-nit and Written Finding-Proposed Dock Petitions- Vote <br /> Required. <br /> Mr.Furbush read the withdrawal letter from BSS Design into the record and made a motion <br /> to accept the withdrawal request. Mr. Blaisdell seconded, yes, Mr. Goldstein, yes, Mr. <br /> DeBarros, yes, Mr. Pittsley, yes, and Mr. Gould, yes. All were in favor of accepting the <br /> letter of withdrawal of the dock project sent by BSS Design. <br /> 3 <br />