Laserfiche WebLink
have a crest between downstream to ensure <br /> #22 and# 26 water is properly <br /> Rosewood Circle draining. <br /> • Mulch -3" below • re-grade to pitch <br /> siding #22 away from homes <br /> Rosewood Circle and egress well <br /> • Splashback on #22 • annually <br /> Rosewood Circle inspect/treat for <br /> may be due to termite and water <br /> clogged gutter damage <br /> 26 Yes Yes • Grade varies from • re-grade to pitch <br /> Rosewood —1 to 3" below away from homes <br /> Circle siding on front and have siding <br /> • Mulch —4" below clearance <br /> siding • annually <br /> inspect/treat for <br /> termite and water <br /> damage <br /> • minimally mulch <br /> area where siding is <br /> <6" above grade <br /> 28 Yes yes • Grade appears to • re-grade to pitch <br /> Rosewood pitch towards#28 away from homes <br /> Circle Rosewood Circle on and have siding <br /> side and rear of clearance <br /> house . annually <br /> • Mulch -2" below inspect/treat for <br /> bottom of siding termite and water <br /> damage <br /> . minimally mulch <br /> area where siding is <br /> <6" above grade <br /> 36 Yes Yes • Patio appears to • re-grade to pitch <br /> Rosewood have low spot where away from homes <br /> water travels and have siding <br /> • Organic growth was clearance <br /> observed in window . recommend to <br /> well remove pavers and <br /> . Mulch 2" below regrade so water <br /> siding on side of drains away from <br /> garage house, re-install <br /> pavers <br /> The Cottages Phase III 9 m <br /> Mashpee, MA <br /> ,A'FfE ' <br />