Laserfiche WebLink
4 <br /> MINUTES August 19, 1993 3 BOARD OF HEALTH <br /> i <br /> "We may approach the Board at a later date to discuss alter- <br /> native septic systems..", <br /> APPOINTMENT: Michael Grotske - 24 Tide Run <br /> Mr. Grotske was in attendance for this scheduled ap- <br /> pointment. <br /> Mr. Grotske informed Board members he is present tonight <br /> for preliminary discussion on a proposed dwelling at 24 Tide <br /> Run. " "The owner is proposing a two bedroom house. " "State <br /> and local variances are necessitated." "There is an isolated <br /> wetland 85' from the proposed leaching facility and the leach <br /> pit would be placed within 5' of the property line. " "All <br /> abutting lots are serviced by town water. " <br /> Mr. Greelish informed Mr. Grotske of the Board's policy <br /> regarding a wetlands variance. <br /> Mr. Grotske stated, "The Conservation Commission Agent <br /> has not verified whether or not the wetland area is a vernal <br /> pool as its source is strictly road runoff." <br /> Mr. Doherty recommended this Board await the Conserva- <br /> tions Commission's. verification of the edge of the wetland <br /> area. " <br /> Mr. Grotske did comment on the possibility of an ease- <br /> ment to the center of the road for placement of the leaching <br /> facility thereby, creating the required distance between the <br /> leaching facility and the edge of wetlands. " <br /> Mr. Greelish informed Mr. Grotske, "That would require <br /> Planning Board approval ." <br /> Mr. Doherty recommended continuing this variance request <br /> pending consultation with the Planning Board as to placement <br /> of the leaching facility within the layout of the road, the <br /> Conservation Commission's determination as to whether the <br /> wetlands area could be considered a vernal pool and verifica- <br /> tion of the edge of the wetland area." <br /> . Board members agreed. <br /> APPOINTMENT: Hank Suominen - Wastewater Treatment Facility <br /> Mr. Hank Suominen and Mr. John Bersani were in atten- <br /> dance for this scheduled appointment. <br /> I <br /> Mr. Greelish relayed, "This is potentially an alterna- <br /> tive to a septage pretreatment plant. " "They are proposing <br /> an alternative that is substantially more cost effective. " <br />