Laserfiche WebLink
MINUTES May 18, 1995 9 BOARD OF HEALTH <br /> monitoring well and measure the fluctuation of the two high tides, which he did." "The <br /> groundwater did actually rise from the 5.9' and 6.2' to 5.3' and 5.2' respectively between <br /> test pits 7 & 8." "Colonel Brogna and I tended to agree that this would tentatively meet <br /> our requirement of the 4' of naturally occurring permeable soil between the bottom of <br /> leaching facility and groundwater." "Now, under the new Title V, 5' is required between <br /> the bottom of the leaching facility and groundwater however, the new Title V, as the old, <br /> is ambiguous as far as, does that permeable soil have to be above or below groundwater." <br /> "Since we haven't changed our regulation, at test pit 8 where groundwater was observed <br /> at 6.2' but actually the monitoring well was observed at 5.2', you have over 4' of naturally <br /> occurring permeable soil which meets our regulations and the new Title V regulations." <br /> "Does the Board wish to consider changing our regulation to 5' of naturally occurring <br /> permeable soil." <br /> Mr. Cram motioned to approve perk test results including the necessary ground <br /> groundwater separation based on information presented and existing regulations, Mr. Ball <br /> seconded, all agreed. <br /> 8.) Revised plans, 37 Great River Road - Mr. McQuaid relayed, "The Board <br /> approved plans on April 27, 1995." "The only revision is the installation of a Ecofin Bio- <br /> clere system to satisfy the Conservation Commission." <br /> Mr. Cram motioned to approve the installation of a Ecofin Bio-clere at 37 Great <br /> River Road, Mr. Ball seconded, all agreed. <br /> 9.) EmeMency Repair Certification, 20 Scituate Road - Mr. Evans relayed, "I <br /> inspected the site and found the leach pit full." <br /> Board members forwarded their signatures to the "Emergency Repair <br /> Certification" form. <br /> *****NEW BUSINESS***** <br /> 30 Devon Road <br /> Mr. McQuaid relayed, "Revised plans were submitted which delineates the well in <br /> an alternative location." "Maximum distances between the abutting and on-site leaching <br /> facilities have been obtained." <br /> Mr. Cram motioned to grant a 44' local variance from the proposed on-site <br /> leaching facility to the proposed on-site well, Mr. Ball seconded, all agreed. <br />