Laserfiche WebLink
To see if the Town will vote to amend the zoning by-laws by adding the <br /> following: <br /> Section 11B. 2.1 Water Resource District including all of the land within <br /> the following described area as shown on "Plan of .Proposed Water Resource <br /> District" dated March 28, 1984 prepared by Cahrles L. Rowley and Associates: <br /> I Including all of the land within the following described lines: <br /> Beginning at a point in the southerly sideline of Nathan S. Ellis Highway <br /> (Route 151) at the existing intersection with Job's Fishing Road as shown on <br /> Assessors Sheet 74; <br /> Thence southeasterly by the centerline of Job's Fishinq-Poad a distance <br /> of 2900 feet more or less; crossing Falmouth Road to Great Neck .Road; <br /> Thence across Great Neck Road, easterly to the southerly sideline of <br /> Timber Landing Road; <br /> Thence easterly and southerly by the southerly sideline and westerly <br /> sideline of Timber Landing Road to River Road; <br /> in the westerly sideline of River Road as most recently <br /> Thence southerly y <br /> laid out to the intersection of Great Neck Road and the southerly boundary of <br /> Lot 2 as shown on Assessors Sheets 89 and 95. <br /> -Thence southerly in the westerly sideline of Great Neck Road to the <br /> southerly line of Lot 35 as shown on Assessors Sheet '99. it being land of <br /> Fields Point Manufacturing Corp; <br /> Thence westerly in said line and continuing westerly in the southerly <br /> line of land of the Town of Mashpee shown as Lot l on Assessors Sheet 99 and <br /> in the southerly-line of land of Eugenia Fortes shown as Lot 12 on Assessors <br /> Sheet 98 to Great Hay Road; <br /> ' Thence northwesterly in a straight line to the intersection of the <br /> southeraYboundaryof the existing I-1 district and easterly sideline of <br /> Falmouth goad (RoV4e 28); <br /> 6: <br />