My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/27/2024 CONSERVATION COMMISSION Minutes (2)
>
06/27/2024 CONSERVATION COMMISSION Minutes (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:18:29 AM
Creation date
3/13/2025 9:02:10 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Agent recommendations: <br /> Install 50/50 sunlight penetration grating on piers and gangways. <br /> Collect or divert parking lot runoff at pier locations (excluding gas <br />dock). <br /> No work to commence until Harbor Master and Waterways <br />Commission finalize individual reviews. <br /> All Harbor Master recommendations are incorporated into the <br />order of conditions. <br /> <br /> Harbor Master: See memorandum <br /> <br /> <br />TH <br />Motion made by Ms. Zollo for a continuance to August 8, 2024, at 6:30 pm. Motion Seconded <br />by Ms. Clapprood. <br /> <br />Further discussion ensued. <br /> <br />o ROLL CALL: Ms. Zollo (Yes), Ms. Clapprood (Yes), Ms. Godfrey (Yes), Ms. <br />Thornbrugh (Yes), Mr. Colombo (Yes). <br /> <br />The motion passes unanimously <br /> <br />Documents provided: Tighe & Bond, Inc., Notice of Intent application and project <br />narrative, 06/14/24 Plan(s) “Preliminary Engineering” (9 sheets) <br /> <br />6:36 <br />NOI 43-3296 <br /> <br /> 53 Greenwood Rd, Brain and Elizabeth Rutana, Trustees, Brian, and Elizabeth <br />Trust. Proposed raze of existing single-family dwelling, construction and maintenance of new <br />single-family dwelling, and installation of a new Title V MicroFast septic tank and <br />appurtenances. Representative: Cape & Islands Engineering, Inc. <br /> <br />Representative: Mark Dibb <br /> <br />Project Description: <br />o Objective: Raze and replace an existing non-flood-compliant single-family <br />dwelling. <br />o Site Location: Mostly in AE 12 flood zone. <br /> <br />10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.