Laserfiche WebLink
 House to be tied into existing wastewater treatment facility at Willowbend. No onsite <br />septic system <br /> <br /> Agent recommends: <br />1) increase in setback from the 50 ft buffer zone by at least10 feet to prevent <br />construction overreach into the 50ft buffer zone to the coastal bank <br />2) If the commission disputes the assertion that the buffer zones are grandfathered, we <br />can seek the opinion of the town's legal counsel. <br />3) The driveway is mainly outside the 100 ft buffer zone to the top of the coastal bank; <br />however, staff strongly recommend proposed asphalt driveway be pervious <br /> <br /> BOARD OF HEALTH: Willowbend WWTF. No comments. <br /> <br />Mr. Cook made a motion for a continuance to October 10, 2024, at 6:30. Ms. Godfrey seconded <br />the motion. No further discussion. <br />o ROLL CALL: Mr. Cook (Yes), Mr. Sahl (Yes), Ms. Godfrey (Yes), Ms. <br />Thornbrugh (Yes), Mr. Colombo (Yes). <br /> <br />The motion passed unanimously. <br /> <br />Documents provided: Baxter-Nye Engineering & Surveying; Request to Amend Order of Conditions 043- <br />3024; 08/01/24 “Existing Conditions Plan” (sheet C1.0); 08/01/24 “Site Plan” (sheet C2.0); 08/01/24 “Details & <br />Notes” (sheet C3.0); Recorded Order of Conditions; Recorded Amended Order of Conditions; Recorded <br />Extension. <br /> <br />6:51 <br />RDA <br /> 21 Debbie Lane, Donald R. Cassidy, Trustee of the Donald R. Cassidy Revocable <br />Trust. Proposed septic system upgrade. Representative: Shay Environmental <br /> <br />Proposed Septic System Upgrade <br /> Current System: <br />o Tank Size: 1500 gallons. <br />o Leading area: not in failure but does not meet the 5ft adjusted groundwater <br />requirement for the Board of Health <br /> <br />Proposed Upgrade <br /> Removal: Existing tank and leaching area. <br /> Installation: New 1500 gallon tank with a sledgehammer I/A system leading to a gravity- <br />fed Presby Leachfield. <br /> <br />Rationale <br /> Compliance with groundwater separation requirements. <br /> Environmental benefits, including nitrogen and phosphorus reduction <br /> Avoidance of constructing retaining walls or bringing in fill material <br /> <br />17 <br /> <br /> <br />